Close
SmartGrid background circleSmartGrid Circle

Modesto Irrigation District

Smart Grid Deployment and Installation Project

Abstract

The Modesto Irrigation District’s (MID’s) Smart Grid Deployment and Installation project involved installation of an advanced metering infrastructure (AMI) system, a meter data management system (MDMS), and a web portal to enable customers to better manage their electricity consumption and costs. The smart meter deployment covered the Mountain House Development, a single isolated area with 3,348 customer sites. The project also included installation of distribution automation (DA) equipment for 45 of 120 circuits and deployment of a distribution management system (DMS).

Contact Information

Ed Franciosa
Interim Assistant General Manager, Transmission and Distribution
Modesto Irrigation District
edf@mid.org



 

At-A-Glance
Recipient: Modesto Irrigation District (Smart Grid Deployment and Installation Project)
HQ State: California
NERC Region: WECC
Total Budget: $3,495,107
Federal Share: $1,493,149
 
Funding Program:
Project Type:
 
Equipment:
Targeted Benefits:
  • Reduced Meter Reading Costs
  • Reduced Operating and Maintenance Costs
  • Improved Electric Service Reliability and Power Quality
  • Reduced Costs from Line Losses
  • Reduced Truck Fleet Fuel Usage
  • Reduced Greenhouse Gas and Criteria Pollutant Emissions