Duke Energy Renewables owns and operates the Notrees Wind Farm in west Texas' Ector and Winkler counties. The wind farm, which was commissioned in April 2009, has a total capacity of 152.6 MW generated by 55 Vestas V82 turbines, one Vestas 1-V90 experimental turbine, and 40 GE 1.5-MW turbines. The Vestas V82 turbines have a generating capacity of 1.65 MW each, the Vestas V90 turbine has a generating capacity of 1.86 MW, and the GE turbines have a generating capacity of 1.5 MW each. The objective of the Notrees Wind Storage Demonstration Project is to validate that energy storage increases the value and practical application of intermittent wind generation and is commercially viable at utility scale. The project incorporates both new and existing technologies and techniques to evaluate the performance and potential of wind energy storage. In addition, it could serve as a model for others to adopt and replicate.

The Department of Energy's Office of Electricity (OE) recognizes that our nation's sustained economic prosperity, quality of life, and global competitiveness depends on an abundance of secure, reliable, and affordable energy resources. OE leads the Department of Energy's efforts to ensure a resilient, and flexible electricity system in the United States. Learn more about OE >>

None:prod None build None