Data reported by:

Southern California Edison Company

Irvine Smart Grid Demonstration
AMI smart meters installed and operational Quantity* Cost
Total 38 $59,559
Residential 38
Commercial 0
Industrial 0
AMI smart meter features operational Feature enabled # of meters with feature
Interval reads 1 38
Remote connection/disconnection Yes 38
Outage detection/reporting Yes 38
Tamper detection Yes 38
AMI communication networks and data systems Description Cost
Backhaul communications description The Backhaul from the Collector Meters (Cell Relays) to SCE back-office uses 4G... $0
Meter communications network Meter to Meter and Meter to Collector (Cell Relays) uses 900 MHz communications...
Head end server The head-end System is provided by Itron's OpenWay system. The primary component... $1,075,244
Meter data analysis system All meter data are collected through the Network Management System and stored...
Other IT systems and applications Not Applicable to Project
Web portal deployed and operational Quantity* Description
Customers with access to web portal 0
Customers enrolled in web portal 0 The gateway that each home has received is capable of displaying a web portal....
Customer systems installed and operational Quantity* Description Cost
Communication networks and home area networks N/A A HAN is a network established in the home to enable access, control and operation... N/A
In home displays 22 Most in-home displays provide consumers with comprehensive information about their... $7,020
Energy management device 22 EMSs control loads in the home and centralize operation and control of other HAN... N/A
Direct load control devices 0 NA $0
Programmable communicating thermostats 31 PCTs are capable of communicating wirelessly with the HAN and enable customers... $9,610
Smart appliances 64 Smart appliances are capable of receiving signals from the AMI HAN and can react... $137,428
Customer system communication networks Description
Network characteristics within customer premise A HAN is a network established in the home to enable access, control and operation...
Distributed energy resources Quantity* Capacity Description Cost
Distributed generation 23 108 kW NA $390,288
Energy storage 16 181 kW $1,850,130
Plug in electric vehicle charging points 44 158 kW $0
Distributed energy resource interface N/A N/A Residential Energy Storage Units (RESU) connect via internet connection to a server... $0

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.

Electric distribution system % Description
Portion of distribution system with SCADA due to SGIG/SGD program 0.00% Not Applicable to Project
Portion of distribution system with DA due to SGIG/SGD program 0.00% Not Applicable to Project
DA devices installed and operational Quantity* Description Cost
Automated feeder switches 0 Not Applicable to Project $0
Automated capacitors 0 $0
Automated regulators 0 $0
Feeder monitors 0 $0
Remote fault indicators 0
Transformer monitors (line) 0 $782,755
Smart relays 0
Fault current limiter 0 $0
Other devices 0 $0
SCADA and DA communications network Cost
Communications equipment and SCADA $0
Distribution management systems integration Integrated Description
AMI 0 The distribution management system (DMS) is used by system operators to monitor...
Outage management system No Not Applicable to Project
Distributed energy resource interface No Residential Energy Storage Units (RESU) connect via internet connection to a server...
Other No Not Applicable to Project
Distribution automation features / functionality Function enabled Description
Fault location, isolation and service restoration (FLISR) No Not Applicable to Project
Voltage optimization No Anticipated for ISGD: Distribution Management System will be used to control distribution...
Feeder peak load management No Not Applicable to Project
Microgrids No Not Applicable to Project
Other functions No Not Applicable to Project

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.