Data reported by:

Progress Energy Service Company - Florida

The Optimized Energy Value Chain(OEVC)
AMI smart meters installed and operational Quantity* Cost
Total 72,048 $73,249,517
Residential 0
Commercial 68,446
Industrial 3,602
AMI smart meter features operational Feature enabled # of meters with feature
Interval reads 1 72,048
Remote connection/disconnection N/A
Outage detection/reporting Yes 72,048
Tamper detection No 0
AMI communication networks and data systems Description Cost
Backhaul communications description Backhaul for the AMI network will utilize leased cellular connections from the... $0
Meter communications network The Progress Energy Florida (PEF) AMI Telecom project constructed a network to...
Head end server The SSN UIQ head end system has been put into production for the deployment phase... $6,743,485
Meter data analysis system
Other IT systems and applications
Web portal deployed and operational Quantity* Description
Customers with access to web portal
Customers enrolled in web portal
Customer systems installed and operational Quantity* Description Cost
Communication networks and home area networks N/A N/A
In home displays
Energy management device N/A
Direct load control devices 0 Not in Place. $0
Programmable communicating thermostats
Smart appliances
Customer system communication networks Description
Network characteristics within customer premise
Distributed energy resources Quantity* Capacity Description Cost
Distributed generation kW No PHEV data collection after 4/30/2013.
Energy storage kW
Plug in electric vehicle charging points 62 465 kW $804,148
Distributed energy resource interface N/A N/A

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.

Electric distribution system % Description
Portion of distribution system with SCADA due to SGIG/SGD program 100.00% Current EMS SCADA system does have a limited number of distribution control points...
Portion of distribution system with DA due to SGIG/SGD program 0.00% All of the distribution breakers are currently under SCADA control, as well as...
DA devices installed and operational Quantity* Description Cost
Automated feeder switches 0 SCADA enabled 442 ABB reclosers to be remotely controlled. $0
Automated capacitors 0 $0
Automated regulators
Feeder monitors 0 $0
Remote fault indicators 0
Transformer monitors (line) 0 $363,581
Smart relays
Fault current limiter
Other devices
SCADA and DA communications network Cost
Communications equipment and SCADA $85,521,189
Distribution management systems integration Integrated Description
AMI 0
Outage management system Yes
Distributed energy resource interface No
Other
Distribution automation features / functionality Function enabled Description
Fault location, isolation and service restoration (FLISR) No NA
Voltage optimization
Feeder peak load management
Microgrids
Other functions

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.

Electric transmission system Portion Description
Portion of transmission system covered by phasor measurement systems
Phasor measurement systems Quantity* Description Cost
PMUs
Phasor data concentrators
Communications network
Other transmission assets   Quantity* Description Cost
Dynamic Capability Rating System (DCRS)
- Transmission Lines
Other transmission assets
Other transmission assets
Other transmission assets
Advanced transmission applications operational    Operational Description Cost
Angle/frequency monitoring
Post-mortem analysis (including compliance monitoring)
Voltage stability monitoring
Thermal overload monitoring
Improved state estimation
Steady-state model benchmarking
DG/IPP applications
Power system restoration

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.