Data reported by:

Progress Energy Service Company - Carolinas

The Optimized Energy Value Chain (OEVC)
AMI smart meters installed and operational Quantity* Cost
Total 58,267 $45,425,443
Residential 18,063
Commercial 40,204
Industrial 0
AMI smart meter features operational Feature enabled # of meters with feature
Interval reads 1 58,267
Remote connection/disconnection N/A
Outage detection/reporting No 0
Tamper detection Yes 58,267
AMI communication networks and data systems Description Cost
Backhaul communications description Backhaul for the AMI network will utilize leased cellular connections from the... $0
Meter communications network The Progress Energy Carolinas (PEC) AMI Telecom project constructed a network...
Head end server The SSN UIQ head end system has been put into production for the deployment phase... $2,421,072
Meter data analysis system
Other IT systems and applications
Web portal deployed and operational Quantity* Description
Customers with access to web portal
Customers enrolled in web portal
Customer systems installed and operational Quantity* Description Cost
Communication networks and home area networks N/A N/A
In home displays
Energy management device N/A
Direct load control devices
Programmable communicating thermostats
Smart appliances
Customer system communication networks Description
Network characteristics within customer premise
Pricing program Customers with access Customers enrolled Description
Prepay 137,0960
Distributed energy resources Quantity* Capacity Description Cost
Distributed generation kW No PHEV data collection after 4/30/2013.
Energy storage kW
Plug in electric vehicle charging points 193 1,445 kW $1,523,683
Distributed energy resource interface N/A N/A

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.

Electric distribution system % Description
Portion of distribution system with SCADA due to SGIG/SGD program 97.00% SCADA at PGN PEC covers all but a small number of primary feeders. Coverage is...
Portion of distribution system with DA due to SGIG/SGD program 97.00% DA at PGN PEC covers all but a small portion of the distribution network. Cover...
DA devices installed and operational Quantity* Description Cost
Automated feeder switches 800 Approximate counts for each device are: Total installed to date. 12/31/13. Voltage Regulators: 2,320 Capacitors: 589 Med Voltage Sensors: 1,583 Low Voltage Sensors: 2,915 Note: a small number of additional devices wer... $22,862,780
Automated capacitors 589 $0
Automated regulators 2,320 $0
Feeder monitors 1,583 $0
Remote fault indicators 0
Transformer monitors (line) $9,067,390
Smart relays
Fault current limiter
Other devices
SCADA and DA communications network Cost
Communications equipment and SCADA $197,605,632
Distribution management systems integration Integrated Description
AMI
Outage management system Yes Not in Scope.
Distributed energy resource interface
Other
Distribution automation features / functionality Function enabled Description
Fault location, isolation and service restoration (FLISR)
Voltage optimization Yes Volt/Var optimization through DA was placed in service in Q4 2012 for selected...
Feeder peak load management Yes Feeder Peak Load Management through DA was placed in service in Q4 2012 for selected...
Microgrids
Other functions

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.

Electric transmission system Portion Description
Portion of transmission system covered by phasor measurement systems
Phasor measurement systems Quantity* Description Cost
PMUs
Phasor data concentrators
Communications network
Other transmission assets   Quantity* Description Cost
Dynamic Capability Rating System (DCRS)
- Transmission Lines
Other transmission assets 50 Condition Based Monitoring (CBM) equipment monitors three key health indicators... $0
Other transmission assets
Other transmission assets
Advanced transmission applications operational    Operational Description Cost
Angle/frequency monitoring
Post-mortem analysis (including compliance monitoring)
Voltage stability monitoring
Thermal overload monitoring
Improved state estimation
Steady-state model benchmarking
DG/IPP applications
Power system restoration

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).