Data reported by:

PECO

Smart Future Greater Philadelphia
AMI smart meters installed and operational Quantity* Cost
Total 784,253 $118,400,057
Residential 766,966
Commercial 17,287
Industrial 0
AMI smart meter features operational Feature enabled # of meters with feature
Interval reads 1 784,253
Remote connection/disconnection Yes 784,253
Outage detection/reporting Yes 784,253
Tamper detection Yes 784,253
AMI communication networks and data systems Description Cost
Backhaul communications description PECO’s AMI Network is comprised of a meter communications network and a backhaul... $49,330,241
Meter communications network PECO’s AMI Network is comprised of a meter communications network and a backhaul...
Head end server Headend system controls communications with meters via the data collection devices... $93,823,165
Meter data analysis system Not deployed or operational
Other IT systems and applications N/A
Web portal deployed and operational Quantity* Description
Customers with access to web portal 784,253
Customers enrolled in web portal 238,988 Same as system.
Customer systems installed and operational Quantity* Description Cost
Communication networks and home area networks N/A N/A N/A
In home displays 196 The ENVI In-home Display Device is a dedicated display device designed to deliver... $56,149
Energy management device 60 VPower System - web-based system that optimizes the controllable resources at... N/A
Direct load control devices 60 Additional load meters, devices that can be cycled or controlled by a utility... $768,912
Programmable communicating thermostats
Smart appliances
Customer system communication networks Description
Network characteristics within customer premise N/A
Pricing program Customers with access Customers enrolled Description
Flat Rate784,253503,303
Same as system.
Net Metering 784,253725
Same as system.
Distributed energy resources Quantity* Capacity Description Cost
Distributed generation kW
Energy storage kW
Plug in electric vehicle charging points 3 9 kW $51,754
Distributed energy resource interface N/A N/A

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.

Electric distribution system % Description
Portion of distribution system with SCADA due to SGIG/SGD program 0.00% PECO is unable to measure the Portion of system with SCADA at the project lev...
Portion of distribution system with DA due to SGIG/SGD program 0.00% PECO is unable to measure the portion of system with DA at the project level.
DA devices installed and operational Quantity* Description Cost
Automated feeder switches 100 Automated Feeder Switches (Reclosers), Automated Capacitors, Smart Relays and Controller Upgrades. $8,177,977
Automated capacitors 63 $4,123,912
Automated regulators
Feeder monitors
Remote fault indicators
Transformer monitors (line) $2,753,027
Smart relays 221
Fault current limiter
Other devices 399 $54,328,635
SCADA and DA communications network Cost
Communications equipment and SCADA $790,565
Distribution management systems integration Integrated Description
AMI 0 The Distribution Management System (DMS) is a collection of applications designed...
Outage management system Yes Outage events are created in the Outage Management System upon receipt of a "power...
Distributed energy resource interface
Other No N/A
Distribution automation features / functionality Function enabled Description
Fault location, isolation and service restoration (FLISR)
Voltage optimization No Not deployed or operational.
Feeder peak load management No Not deployed or operational.
Microgrids
Other functions No N/A

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.