NRECA-SREC
Electric distribution system | % | Description |
---|---|---|
Portion of distribution system with SCADA due to SGIG/SGD program | 0% | |
Portion of distribution system with DA due to SGIG/SGD program | 100.00% | 40 circuits on the system are tied together using an automated switching scheme. The circuits communicate through simple RTU logic and SCADA to determine when to open or close. There is a 3 minute window for the switching to occur. The total system is 100 circuits. |
DA devices installed and operational | Quantity* | Description | Cost |
---|---|---|---|
Automated feeder switches | 29 | 29 S&C Intellirupter switches have been installed. They are controlled by internal logic. | $24,493 |
Automated capacitors | 0 | $0 | |
Automated regulators | 0 | $0 | |
Feeder monitors | 100 | $0 | |
Remote fault indicators | 0 | $0 | |
Transformer monitors (line) | 0 | $0 | |
Smart relays | 0 | ||
Fault current limiter | 0 | $0 | |
Other devices | 0 | $0 |
SCADA and DA communications network | Cost |
---|---|
Communications equipment and SCADA | $0 |
Distribution management systems integration | Integrated | Description |
---|---|---|
AMI | No | |
Outage management system | No | |
Distributed energy resource interface | No | |
Other | No |
Distribution automation features / functionality | Function enabled | Description |
---|---|---|
Fault location, isolation and service restoration (FLISR) | No | N/A |
Voltage optimization | No | N/A |
Feeder peak load management | No | N/A |
Microgrids | No | N/A |
Other functions | No | N/A |
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.