NRECA-OEC
AMI smart meters installed and operational | Quantity* | Cost |
---|---|---|
Total | 0 | $0 |
Residential | 0 | |
Commercial | 0 | |
Industrial | 0 |
AMI smart meter features operational | Feature enabled | # of meters with feature |
---|---|---|
Interval reads | No | 0 |
Remote connection/disconnection | No | 0 |
Outage detection/reporting | No | 0 |
Tamper detection | No | 0 |
AMI communication networks and data systems | Description | Cost |
---|---|---|
Backhaul communications description | $0 | |
Meter communications network | ||
Head end server | $0 | |
Meter data analysis system | ||
Other IT systems and applications |
Web portal deployed and operational | Quantity* | Description |
---|---|---|
Customers with access to web portal | 188 | SaaS with user tools for member usage and utility analysis. |
Customers enrolled in web portal | 188 | SaaS - usage history, change settings, web chat, etc. |
Customer systems installed and operational | Quantity* | Description | Cost |
---|---|---|---|
Communication networks and home area networks | N/A | Thermostat,water heater, portal, meter & transport | N/A |
In home displays | 2 | Purchased and installed 2 at Smart Home Pilot enrollees request. | $10,694 |
Energy management device | 0 | 0 | N/A |
Direct load control devices | 0 | $0 | |
Programmable communicating thermostats | 0 | $0 | |
Smart appliances | 0 | 0 - none planned with pilot | $10,694 |
Customer system communication networks | Description |
---|---|
Network characteristics within customer premise | Thermostat,water heater, portal, meter & transport |
Pricing program | Customers with access | Customers enrolled | Description |
---|---|---|---|
Net Metering | 0 | 0 | |
Time of Use Rate | 310 | 188 | Three level TOD rate approved for pilot |
Electric distribution system | % | Description |
---|---|---|
Portion of distribution system with SCADA due to SGIG/SGD program | 100.00% | Fiber communication in S/S, new RTU, New Regulator controls, upgraded metering, etc. |
Portion of distribution system with DA due to SGIG/SGD program | 100.00% |
DA devices installed and operational | Quantity* | Description | Cost |
---|---|---|---|
Automated feeder switches | 2 | We installed self healing for two locations for critical customers | $18,744 |
Automated capacitors | 0 | $9,002 | |
Automated regulators | 0 | $9,002 | |
Feeder monitors | 0 | $37,466 | |
Remote fault indicators | 0 | $0 | |
Transformer monitors (line) | 0 | $0 | |
Smart relays | 0 | ||
Fault current limiter | 0 | $0 | |
Other devices | 0 | $19,464 |
SCADA and DA communications network | Cost |
---|---|
Communications equipment and SCADA | $90,012 |
Distribution management systems integration | Integrated | Description |
---|---|---|
AMI | No | |
Outage management system | No | |
Distributed energy resource interface | No | |
Other | No |
Distribution automation features / functionality | Function enabled | Description |
---|---|---|
Fault location, isolation and service restoration (FLISR) | No | Yes two installation as noted above in DA |
Voltage optimization | No | Yes plan to evaluate two substation for VVO, if viable will deploy |
Feeder peak load management | No | |
Microgrids | No | |
Other functions | No |
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.