NRECA-MEC
AMI smart meters installed and operational | Quantity* | Cost |
---|---|---|
Total | 0 | $0 |
Residential | 0 | |
Commercial | 0 | |
Industrial | 0 |
AMI smart meter features operational | Feature enabled | # of meters with feature |
---|---|---|
Interval reads | No | 0 |
Remote connection/disconnection | No | 0 |
Outage detection/reporting | No | 0 |
Tamper detection | No | 0 |
AMI communication networks and data systems | Description | Cost |
---|---|---|
Backhaul communications description | $0 | |
Meter communications network | ||
Head end server | $0 | |
Meter data analysis system | ||
Other IT systems and applications |
Web portal deployed and operational | Quantity* | Description |
---|---|---|
Customers with access to web portal | 866 | The goals of implementing a Web Portal/MDM are to allow members to view their electric consumption data on the internet. Menard Electric Cooperative hopes that this will educate its members on how they use electricity, and would be a tool to assist them with managing their usage, by doing so the members will be better informed thereby reducing calls to staff. This could also develop into a program that could provide members information to understand more sophisticated rates for time of use billing, and critical peak pricing. |
Customers enrolled in web portal | 866 |
Customer systems installed and operational | Quantity* | Description | Cost |
---|---|---|---|
Communication networks and home area networks | N/A | N/A | |
In home displays | 0 | Not Applicable | $0 |
Energy management device | 0 | N/A | |
Direct load control devices | 0 | -1 | $0 |
Programmable communicating thermostats | 0 | NA | $0 |
Smart appliances | 0 | $0 |
Electric distribution system | % | Description |
---|---|---|
Portion of distribution system with SCADA due to SGIG/SGD program | 0% | |
Portion of distribution system with DA due to SGIG/SGD program | 100.00% | We have installed all 49 of the capacitor banks. |
DA devices installed and operational | Quantity* | Description | Cost |
---|---|---|---|
Automated feeder switches | 0 | We have installed all 49 of the capacitor banks. | $0 |
Automated capacitors | 49 | $56,622 | |
Automated regulators | 0 | $0 | |
Feeder monitors | 0 | $0 | |
Remote fault indicators | 0 | $0 | |
Transformer monitors (line) | 0 | $0 | |
Smart relays | 0 | ||
Fault current limiter | 0 | $0 | |
Other devices | 0 | $0 |
SCADA and DA communications network | Cost |
---|---|
Communications equipment and SCADA | $0 |
Distribution management systems integration | Integrated | Description |
---|---|---|
AMI | No | |
Outage management system | No | |
Distributed energy resource interface | No | |
Other | No |
Distribution automation features / functionality | Function enabled | Description |
---|---|---|
Fault location, isolation and service restoration (FLISR) | No | NA |
Voltage optimization | No | NA |
Feeder peak load management | No | NA |
Microgrids | No | NA |
Other functions | No | NA |
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.