NRECA-HCREC
AMI smart meters installed and operational | Quantity* | Cost |
---|---|---|
Total | 0 | $0 |
Residential | 1,780 | |
Commercial | 11 | |
Industrial | 121 |
AMI smart meter features operational | Feature enabled | # of meters with feature |
---|---|---|
Interval reads | Yes | 1,912 |
Remote connection/disconnection | No | 0 |
Outage detection/reporting | Yes | 2,102 |
Tamper detection | Yes | 2,110 |
AMI communication networks and data systems | Description | Cost |
---|---|---|
Backhaul communications description | -1 | $0 |
Meter communications network | -1 | |
Head end server | -1 | $0 |
Meter data analysis system | Yukon System tracks voltage, kwh ,demand and time of use. data is then pushedto Ivue | |
Other IT systems and applications | -1 |
Web portal deployed and operational | Quantity* | Description |
---|---|---|
Customers with access to web portal | 0 | |
Customers enrolled in web portal | 0 |
Customer systems installed and operational | Quantity* | Description | Cost |
---|---|---|---|
Communication networks and home area networks | N/A | N/A | |
In home displays | 0 | $0 | |
Energy management device | 0 | N/A | |
Direct load control devices | 462 | Cannon Cooper LCR 3102 two way receiver | $0 |
Programmable communicating thermostats | 0 | -1 | $0 |
Smart appliances | 0 | $0 |
Customer system communication networks | Description |
---|---|
Network characteristics within customer premise |
Pricing program | Customers with access | Customers enrolled | Description |
---|---|---|---|
Tiered Rate | 1,648 | 1,648 | Single phase service: The first 1000 kwh @ $.1169. Balance of kwh @ $.0820. Single Phase Service. Monthly facility charge $30.00. Energy Cost adjustment is APP. Rates C1,F1,F1T |
Other rate program | 11 | 11 | Large power service 100KVA and over:$75.00 Facility charge $16.00 per KW demand $.05450 per KWH ECA is applicable Rates CD1,ID |
Flat Rate | 211 | 211 | Electric Heat Rate: $.05/Kwh and shall be metered separately. Kwh's metered through the heat meter during May, June, July, August and September shall be $.082/Kwh. Energy Cost Adjustment is applicable. Rates RH1, RH1T |
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.