AMI smart meters installed and operational | Quantity* | Cost |
---|---|---|
Total | 0 | $6,332 |
Residential | 1,858 | |
Commercial | 0 | |
Industrial | 0 |
AMI smart meter features operational | Feature enabled | # of meters with feature |
---|---|---|
Interval reads | No | 0 |
Remote connection/disconnection | No | 0 |
Outage detection/reporting | No | 0 |
Tamper detection | No | 0 |
AMI communication networks and data systems | Description | Cost |
---|---|---|
Backhaul communications description | $32,896 | |
Meter communications network | ||
Head end server | $11,240 | |
Meter data analysis system | ||
Other IT systems and applications |
Web portal deployed and operational | Quantity* | Description |
---|---|---|
Customers with access to web portal | 0 | |
Customers enrolled in web portal | 0 |
Customer systems installed and operational | Quantity* | Description | Cost |
---|---|---|---|
Communication networks and home area networks | N/A | N/A | |
In home displays | 0 | $0 | |
Energy management device | 0 | N/A | |
Direct load control devices | 316 | Cooper Power Systems LCR 3102 Two-way Load COntrol Receiver | $0 |
Programmable communicating thermostats | 0 | $0 | |
Smart appliances | 0 | $0 |
Customer system communication networks | Description |
---|---|
Network characteristics within customer premise |
Pricing program | Customers with access | Customers enrolled | Description |
---|---|---|---|
Other rate program | 1,623 | 3 | Rate B-1 is available for commercial, industrial, and multi-phase farm accounts with a three tier declining block energy component. |
Tiered Rate | 1,623 | 1,609 |
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.