Data reported by:

New York Independent System Operator, Inc.

New York Capacitor/Phasor Measurement Project
Electric distribution system % Description
Portion of distribution system with SCADA due to SGIG/SGD program
Portion of distribution system with DA due to SGIG/SGD program
DA devices installed and operational Quantity* Description Cost
Automated feeder switches All capacitors have been installed.
Automated capacitors 938 $36,654,706
Automated regulators
Feeder monitors
Remote fault indicators
Transformer monitors (line)
Smart relays
Fault current limiter
Other devices
SCADA and DA communications network Cost
Communications equipment and SCADA
Distribution management systems integration Integrated Description
AMI
Outage management system
Distributed energy resource interface
Other
Distribution automation features / functionality Function enabled Description
Fault location, isolation and service restoration (FLISR)
Voltage optimization
Feeder peak load management
Microgrids
Other functions

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.

Electric transmission system Portion Description
Portion of transmission system covered by phasor measurement systems 23.00%
Phasor measurement systems Quantity* Description Cost
PMUs 41 PMUs EHV and Above are defined as those with levels of 345 kV or higher. All... $1,602,178
Phasor data concentrators 11 Make and model, security measures, consistency NASPI and synchrophaso standards,... $448,486
Communications network All WAN connections from the TO Control Centers to the NYISO's Control Centers... $7,197,948
Other transmission assets   Quantity* Description Cost
Dynamic Capability Rating System (DCRS)
- Transmission Lines
Other transmission assets
Other transmission assets
Other transmission assets
Advanced transmission applications operational    Operational Description Cost
Angle/frequency monitoring 1 Voltage Stability Monitoring and State Estimation have been deployed to production, and Oscillation Detection is undergoing tuning and validity testing in the Staging Environment in preparation for deployment to production. $7,903,176
Post-mortem analysis (including compliance monitoring) Yes
Voltage stability monitoring Yes
Thermal overload monitoring
Improved state estimation Yes
Steady-state model benchmarking
DG/IPP applications
Power system restoration

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.