Recipient information | Input |
---|---|
Total number of customers served by utility / utilities supporting the project | 758,055 |
Total number of residential customers served by utility / utilities supporting the project | 637,944 |
Total number of commercial customers served by utility / utilities supporting the project | 119,070 |
Total number of industrial customers served by utility / utilities supporting the project | 1,041 |
Total number of distribution circuits within utility service territory | 441 |
Total number of distribution substations | 171 |
Portion of distribution system with SCADA prior to SGIG/SGD program | 0 |
Portion of distribution system with distribution automation (DA) prior to SGIG/SGD program | 0 |
Electric distribution system | % | Description |
---|---|---|
Portion of distribution system with SCADA due to SGIG/SGD program | 92.70% | This metric is calculated as the percent of system with upgraded RTUs. |
Portion of distribution system with DA due to SGIG/SGD program | 80.00% | This metric is calculated as the percent of system with upgraded feeder breaker relays. |
DA devices installed and operational | Quantity* | Description | Cost |
---|---|---|---|
Automated feeder switches | 0 | The DA Metric being reported is the installation of feeder relays. MEAG is replacing substation electromechanical relays with DNP-3 based microprocessor based relays. The new relays are anticipated to reduce maintenance needs, provide expanded sets of information and will support future DA deployments. | $0 |
Automated capacitors | 0 | $0 | |
Automated regulators | 813 | $3,647,080 | |
Feeder monitors | 0 | $10,037,614 | |
Remote fault indicators | 0 | $0 | |
Transformer monitors (line) | 0 | $0 | |
Smart relays | 284 | ||
Fault current limiter | 0 | $0 | |
Other devices | 238 | $3,396,616 |
SCADA and DA communications network | Cost |
---|---|
Communications equipment and SCADA | $7,453,392 |
Distribution management systems integration | Integrated | Description |
---|---|---|
AMI | No | |
Outage management system | No | |
Distributed energy resource interface | No | |
Other | No |
Distribution automation features / functionality | Function enabled | Description |
---|---|---|
Fault location, isolation and service restoration (FLISR) | No | |
Voltage optimization | No | |
Feeder peak load management | No | |
Microgrids | No | |
Other functions | No |
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.