Data reported by:

Memphis Light, Gas and Water Division

Implementation of Smart Grid Technology in a Network Electric Distribution System
Recipient information Input
Total number of customers served by utility / utilities supporting the project 406,191
Total number of residential customers served by utility / utilities supporting the project 362,541
Total number of commercial customers served by utility / utilities supporting the project 43,505
Total number of industrial customers served by utility / utilities supporting the project 145
Total number of distribution circuits within utility service territory 464
Total number of distribution substations 61
Portion of distribution system with SCADA prior to SGIG/SGD program
Portion of distribution system with distribution automation (DA) prior to SGIG/SGD program
Electric distribution system % Description
Portion of distribution system with SCADA due to SGIG/SGD program 100.00% None of MLGW's electric distribution system currently has SCADA. The project...
Portion of distribution system with DA due to SGIG/SGD program 95.00% Each transformer's network protector switch is controlled by a relay. All of MLGW's...
DA devices installed and operational Quantity* Description Cost
Automated feeder switches 0 These switches are not part of the SGIG funding and project. However, this project enables these DA devices as part of a SCADA/DMS system. This project has no impact on the number of these devices deployed in the field, so this will not be reported as a ... $3,625,304
Automated capacitors
Automated regulators
Feeder monitors
Remote fault indicators
Transformer monitors (line)
Smart relays 466
Fault current limiter
Other devices 220
SCADA and DA communications network Cost
Communications equipment and SCADA $5,235,885
Distribution management systems integration Integrated Description
AMI
Outage management system No
Distributed energy resource interface
Other
Distribution automation features / functionality Function enabled Description
Fault location, isolation and service restoration (FLISR) No A feature of the new DMS software could calculate the location of cable faults...
Voltage optimization
Feeder peak load management No The new DMS system will provide the capability to remotely switch load at the...
Microgrids
Other functions No None have yet been identified, but MLGW will report these if they become avai...

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.