Data reported by:

Los Angeles Department of Water and Power

Smart Grid Regional Demonstration
AMI smart meters installed and operational Quantity* Cost
Total 47,300 $5,836,600
Residential 47,300
Commercial 0
Industrial 0
AMI smart meter features operational Feature enabled # of meters with feature
Interval reads 1 47,300
Remote connection/disconnection Yes 47,300
Outage detection/reporting Yes 47,300
Tamper detection Yes 47,300
AMI communication networks and data systems Description Cost
Backhaul communications description The demonstration project will utilize two approaches to communications. Where... $295,000
Meter communications network The demonstration project will utilize two approaches to communications. Where...
Head end server The purpose of the head-end system is to interface the advanced metering infrastructure... $600,732
Meter data analysis system The back-office (which includes the Meter Data Management) will be programmed...
Other IT systems and applications N/A
Web portal deployed and operational Quantity* Description
Customers with access to web portal 87
Customers enrolled in web portal 65 Web-based interface where customers can view their current usage, receive billing...
Customer systems installed and operational Quantity* Description Cost
Communication networks and home area networks N/A The HAN/ service gateway deployment will allow customers to set preferences for... N/A
In home displays 0 N/A $0
Energy management device 0 The university participants of the project have Energy Management Systems. As... N/A
Direct load control devices 0 Where technically possible, the project will have direct control over customer... $0
Programmable communicating thermostats 0 The project will be providing customers with programmable thermostats which will... $0
Smart appliances 0 The project will support the deployment of Smart Appliance at customer homes.... $0
Customer system communication networks Description
Network characteristics within customer premise The HAN/ service gateway deployment will allow customers to set preferences for...
Distributed energy resources Quantity* Capacity Description Cost
Distributed generation 0 0 kW N/A $0
Energy storage 0 0 kW $0
Plug in electric vehicle charging points 671 5,000 kW $3,600,000
Distributed energy resource interface N/A N/A The project will create a "garage of the future" to do a full scale test of the... $0

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.

Electric distribution system % Description
Portion of distribution system with SCADA due to SGIG/SGD program 0.00% 0%
Portion of distribution system with DA due to SGIG/SGD program 0.00% N/A
DA devices installed and operational Quantity* Description Cost
Automated feeder switches 0 As part of this project the following deviced will be installed and tested: Distribution transformer monitors (74 pcs) Fault Indicators Remotely controlled 34.5kv switch Remotely controlled cap banks $0
Automated capacitors 0 $0
Automated regulators 0 $0
Feeder monitors 0 $0
Remote fault indicators 0
Transformer monitors (line) 0 $0
Smart relays 0
Fault current limiter 0 $0
Other devices 0 $0
SCADA and DA communications network Cost
Communications equipment and SCADA $0
Distribution management systems integration Integrated Description
AMI 0 N/A
Outage management system No CGI’s PragmaLINE Outage Management System is used to gather information on the...
Distributed energy resource interface No The project will create a "garage of the future" to do a full scale test of the...
Other No N/A
Distribution automation features / functionality Function enabled Description
Fault location, isolation and service restoration (FLISR) No N/A
Voltage optimization No Using simulation tools we will demonstrate how to coordinate and manage voltage...
Feeder peak load management No N/A
Microgrids No The USC campus microgrid test bed is a smart grid environment with diverse building...
Other functions No N/A

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.