Data reported by:

Indianapolis Power & Light Company

Smart Energy Project
Recipient information Input
Total number of customers served by utility / utilities supporting the project 467,833
Total number of residential customers served by utility / utilities supporting the project 416,500
Total number of commercial customers served by utility / utilities supporting the project 46,708
Total number of industrial customers served by utility / utilities supporting the project 4,625
Total number of AMI smart meters installed and operational prior to the SGIG/SGD program
AMI smart meters installed and operational Quantity* Cost
Total 10,275 $3,618,226
Residential 3,817
Commercial 6,408
Industrial 50
AMI smart meter features operational Feature enabled # of meters with feature
Interval reads 1 10,275
Remote connection/disconnection Yes 10,275
Outage detection/reporting No 0
Tamper detection Yes 10,275
AMI communication networks and data systems Description Cost
Backhaul communications description 100% complete - IPL is installing Silver Spring Networks AMI 900 MHz mesh backhaul... $12,448,655
Meter communications network None.
Head end server Silver Spring Networks AMI software system known as Utility IQ is installed to... $0
Meter data analysis system
Other IT systems and applications The existing Landis + Gyr Automated Meter Reading (AMR) system is integrated to...
Web portal deployed and operational Quantity* Description
Customers with access to web portal 470,000
Customers enrolled in web portal 8,899 Website transformation is complete. IPL added an energy dashboard for customers...
Customer systems installed and operational Quantity* Description Cost
Communication networks and home area networks N/A No longer in scope. N/A
In home displays 0 No longer in scope. $0
Energy management device N/A
Direct load control devices 0 Not in scope. $0
Programmable communicating thermostats 0 No longer in scope. $0
Smart appliances
Customer system communication networks Description
Network characteristics within customer premise No longer in scope.
Pricing program Customers with access Customers enrolled Description
Electric Vehicle Tariff TOU465,00098

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.

Recipient information Input
Total number of customers served by utility / utilities supporting the project 467,833
Total number of residential customers served by utility / utilities supporting the project 416,500
Total number of commercial customers served by utility / utilities supporting the project 46,708
Total number of industrial customers served by utility / utilities supporting the project 4,625
Total number of distribution circuits within utility service territory 400
Total number of distribution substations 88
Portion of distribution system with SCADA prior to SGIG/SGD program
Portion of distribution system with distribution automation (DA) prior to SGIG/SGD program
Electric distribution system % Description
Portion of distribution system with SCADA due to SGIG/SGD program 0.00% The project does not include SCADA deployment.
Portion of distribution system with DA due to SGIG/SGD program 27.00% All of the planned distribution automation devices have been installed which include...
DA devices installed and operational Quantity* Description Cost
Automated feeder switches 184 Reclosers act as circuit breakers to isolate faults on a circuit, feeder relays provide system protection at substation level devices, capacitor controls automate voltage management efforts and network protectors isolate downtown underground network faults... $16,362,598
Automated capacitors 1,308 $5,931,260
Automated regulators 76
Feeder monitors
Remote fault indicators 3
Transformer monitors (line) 17 $893,081
Smart relays 618
Fault current limiter
Other devices 102 $1,217,597
SCADA and DA communications network Cost
Communications equipment and SCADA $4,279,822
Distribution management systems integration Integrated Description
AMI
Outage management system No AMI data is expected to be integrated with IPL's existing OMS provided by CGI...
Distributed energy resource interface
Other The existing Landis + Gyr Automated Meter Reading (AMR) system is integrated to...
Distribution automation features / functionality Function enabled Description
Fault location, isolation and service restoration (FLISR) No IPL uses feeder relays and reclosers to identify and isolate faults. Switching...
Voltage optimization No IPL is using remote load tap changer controls at substation transformers and distribution...
Feeder peak load management No Not planned in the project.
Microgrids
Other functions

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.