AMI smart meters installed and operational | Quantity* | Cost |
---|---|---|
Total | 0 | $0 |
Residential | 0 | |
Commercial | 0 | |
Industrial | 0 |
AMI smart meter features operational | Feature enabled | # of meters with feature |
---|---|---|
Interval reads | No | 0 |
Remote connection/disconnection | No | 0 |
Outage detection/reporting | No | 0 |
Tamper detection | No | 0 |
AMI communication networks and data systems | Description | Cost |
---|---|---|
Backhaul communications description | $0 | |
Meter communications network | ||
Head end server | $0 | |
Meter data analysis system | ||
Other IT systems and applications |
Distributed energy resources | Quantity* | Capacity | Description | Cost |
---|---|---|---|---|
Distributed generation | 0 | 0 kW | The site configuration starts at the existing 69kV line and proceeds to the 12/16/20 69kV to 13.8kV power transformer and then to the 15kV class Substation Switch Gear. The switch gear is split into two separate circuits with 10MW on each circuit which are loop fed into five 13.8kV to 480V pad mounted distribution transformers. Connected to each pad mount transformers are two 1MW groupings of Flywheels. Each 1MW grouping consists of ten 100kW flywheels. | $0 |
Energy storage | 109 | 10,000 kW | $13,105,663 | |
Plug in electric vehicle charging points | 0 | 0 kW | $0 | |
Distributed energy resource interface | N/A | N/A | $0 |
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).