Recipient information | Input |
---|---|
Total number of customers served by utility / utilities supporting the project | 46,642 |
Total number of residential customers served by utility / utilities supporting the project | 40,848 |
Total number of commercial customers served by utility / utilities supporting the project | 5,793 |
Total number of industrial customers served by utility / utilities supporting the project | 1 |
Total number of AMI smart meters installed and operational prior to the SGIG/SGD program | 0 |
AMI smart meters installed and operational | Quantity* | Cost |
---|---|---|
Total | 0 | $8,265,137 |
Residential | 43,538 | |
Commercial | 6,695 | |
Industrial | 0 |
AMI smart meter features operational | Feature enabled | # of meters with feature |
---|---|---|
Interval reads | Yes | 50,233 |
Remote connection/disconnection | No | 43,538 |
Outage detection/reporting | No | 50,233 |
Tamper detection | No | 50,233 |
AMI communication networks and data systems | Description | Cost |
---|---|---|
Backhaul communications description | Backhaul Network installed by ABB/Tropos and covers the entire network using wireless mesh technology. | $3,963,490 |
Meter communications network | Landis + Gyr meter installation began Oct. 1,2012 and was completed June 30, 2014. Meters have communications chips embedded for communications to routers and collectors on the network. | |
Head end server | Landis + Gyr Command Center has been installed as the AMI Headend System. | $858,865 |
Meter data analysis system | SmartWorks MDMS is used to store, analyze and verify meter data from at the utility. SmartWorks Customer Connect (myenergyguam.com) launched in December 2013, for customers to monitor their energy usage from home. | |
Other IT systems and applications |
Web portal deployed and operational | Quantity* | Description |
---|---|---|
Customers with access to web portal | 50,233 | |
Customers enrolled in web portal | 2,112 | Web portal fully operational. 2,112 customers have enrolled as of 6/30/14 |
Customer systems installed and operational | Quantity* | Description | Cost |
---|---|---|---|
Communication networks and home area networks | N/A | N/A | |
In home displays | 0 | $0 | |
Energy management device | 0 | N/A | |
Direct load control devices | 0 | $0 | |
Programmable communicating thermostats | 0 | $0 | |
Smart appliances | 0 | $0 |
Customer system communication networks | Description |
---|---|
Network characteristics within customer premise |
Pricing program | Customers with access | Customers enrolled | Description |
---|---|---|---|
Realtime Rate | 0 | 0 | No updates. |
Flat Rate | 4,700 | 4,700 | GPA uses a flat rate for almost all customers with the exception of a handful of customers on a prepay pricing pilot and a few utilizing net metering. |
Flat rate with Critical Peak Pricing | 0 | 0 | No updates. |
Net Metering | 103 | 103 | There are a very limited number of customers who are on a net metering program. Although these customers had net metering before the SGIG project, they are now using smart meters to track the net metering. |
Prepay | 0 | 0 | GPA deployed a pre-pay pilot in 2010-2011 with a handful of customers (~40) using this program. The final full program implementation will occur in January 2014 with an estimated go-live date of February 2014. |
Realtime rate with Critical Peak Pricing | 0 | 0 | Scheduled to start 3rd Quarter of 2013. |
Tiered Rate | 0 | 0 | No updates. |
Tiered rate with Critical Peak Pricing | 0 | 0 | No updates. |
Tiered rate with Peak Time Rebates | 0 | 0 | No updates. |
Time of Use Rate | 0 | 0 | No updates. |
Time of Use rate with Critical Peak Pricing | 0 | 0 | No updates. |
Variable | 0 | 0 | No updates. |
Distributed energy resources | Quantity* | Capacity | Description | Cost |
---|---|---|---|---|
Distributed generation | 0 | 0 kW | $0 | |
Energy storage | 0 | 0 kW | $0 | |
Plug in electric vehicle charging points | 0 | 0 kW | $0 | |
Distributed energy resource interface | N/A | N/A | $0 |
Recipient information | Input |
---|---|
Total number of customers served by utility / utilities supporting the project | 46,642 |
Total number of residential customers served by utility / utilities supporting the project | 40,848 |
Total number of commercial customers served by utility / utilities supporting the project | 5,793 |
Total number of industrial customers served by utility / utilities supporting the project | 1 |
Total number of distribution circuits within utility service territory | 66 |
Total number of distribution substations | 29 |
Portion of distribution system with SCADA prior to SGIG/SGD program | 0 |
Portion of distribution system with distribution automation (DA) prior to SGIG/SGD program | 0 |
Electric distribution system | % | Description |
---|---|---|
Portion of distribution system with SCADA due to SGIG/SGD program | 0% | N/A |
Portion of distribution system with DA due to SGIG/SGD program | 0% | Project has been discontinued. |
DA devices installed and operational | Quantity* | Description | Cost |
---|---|---|---|
Automated feeder switches | 0 | Project has been discontinued. | $0 |
Automated capacitors | 0 | $0 | |
Automated regulators | 0 | $0 | |
Feeder monitors | 0 | $0 | |
Remote fault indicators | 0 | $0 | |
Transformer monitors (line) | 0 | $0 | |
Smart relays | 0 | ||
Fault current limiter | 0 | $0 | |
Other devices | 0 | $0 |
SCADA and DA communications network | Cost |
---|---|
Communications equipment and SCADA | $3,916,337 |
Distribution management systems integration | Integrated | Description |
---|---|---|
AMI | No | |
Outage management system | No | GPA had previously purchased Milsoft OMS before SGIS project began. SAIC performed an analysis on this project and determined it was sufficient and beneficial for GPA OMS needs. Implementation commenced in Q1 2014. Testing and integration on-going. |
Distributed energy resource interface | No | |
Other | No |
Distribution automation features / functionality | Function enabled | Description |
---|---|---|
Fault location, isolation and service restoration (FLISR) | Yes | Project has been discontinued. |
Voltage optimization | Yes | Project has been discontinued. |
Feeder peak load management | Yes | Project has been discontinued. |
Microgrids | Yes | Microgrids are not in the scope of this project |
Other functions | Yes |
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.