Data reported by:

Guam Power Authority

Smart Grid Project
Recipient information Input
Total number of customers served by utility / utilities supporting the project 46,642
Total number of residential customers served by utility / utilities supporting the project 40,848
Total number of commercial customers served by utility / utilities supporting the project 5,793
Total number of industrial customers served by utility / utilities supporting the project 1
Total number of AMI smart meters installed and operational prior to the SGIG/SGD program
AMI smart meters installed and operational Quantity* Cost
Total 50,233 $8,265,137
Residential 43,538
Commercial 6,695
Industrial 0
AMI smart meter features operational Feature enabled # of meters with feature
Interval reads 1 50,233
Remote connection/disconnection No 43,538
Outage detection/reporting No 50,233
Tamper detection No 50,233
AMI communication networks and data systems Description Cost
Backhaul communications description Backhaul Network installed by ABB/Tropos and covers the entire network using wireless... $3,963,490
Meter communications network Landis + Gyr meter installation began Oct. 1,2012 and was completed June 30, 2014....
Head end server Landis + Gyr Command Center has been installed as the AMI Headend System. $858,865
Meter data analysis system SmartWorks MDMS is used to store, analyze and verify meter data from at the utility....
Other IT systems and applications
Web portal deployed and operational Quantity* Description
Customers with access to web portal 50,233
Customers enrolled in web portal 2,112 Web portal fully operational. 2,112 customers have enrolled as of 6/30/14
Customer systems installed and operational Quantity* Description Cost
Communication networks and home area networks N/A N/A
In home displays
Energy management device N/A
Direct load control devices
Programmable communicating thermostats
Smart appliances
Customer system communication networks Description
Network characteristics within customer premise
Distributed energy resources Quantity* Capacity Description Cost
Distributed generation kW
Energy storage kW
Plug in electric vehicle charging points kW
Distributed energy resource interface N/A N/A

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.

Recipient information Input
Total number of customers served by utility / utilities supporting the project 46,642
Total number of residential customers served by utility / utilities supporting the project 40,848
Total number of commercial customers served by utility / utilities supporting the project 5,793
Total number of industrial customers served by utility / utilities supporting the project 1
Total number of distribution circuits within utility service territory 66
Total number of distribution substations 29
Portion of distribution system with SCADA prior to SGIG/SGD program
Portion of distribution system with distribution automation (DA) prior to SGIG/SGD program
Electric distribution system % Description
Portion of distribution system with SCADA due to SGIG/SGD program 0.00% N/A
Portion of distribution system with DA due to SGIG/SGD program 0.00% Project has been discontinued.
DA devices installed and operational Quantity* Description Cost
Automated feeder switches 0 Project has been discontinued. $0
Automated capacitors 0 $0
Automated regulators 0 $0
Feeder monitors 0 $0
Remote fault indicators 0
Transformer monitors (line) 0 $0
Smart relays 0
Fault current limiter
Other devices $0
SCADA and DA communications network Cost
Communications equipment and SCADA $3,916,337
Distribution management systems integration Integrated Description
AMI 0
Outage management system No GPA had previously purchased Milsoft OMS before SGIS project began. SAIC performed...
Distributed energy resource interface No
Other
Distribution automation features / functionality Function enabled Description
Fault location, isolation and service restoration (FLISR) Yes Project has been discontinued.
Voltage optimization Yes Project has been discontinued.
Feeder peak load management Yes Project has been discontinued.
Microgrids Yes Microgrids are not in the scope of this project
Other functions Yes

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.