Data reported by:

Golden Spread Electric Cooperative

Lyntegar
AMI smart meters installed and operational Quantity* Cost
Total 19,223 $6,096,226
Residential 4,055
Commercial 3,400
Industrial 11,768
AMI smart meter features operational Feature enabled # of meters with feature
Interval reads 1 19,223
Remote connection/disconnection No 0
Outage detection/reporting Yes 19,223
Tamper detection Yes 19,223
AMI communication networks and data systems Description Cost
Backhaul communications description None. $35,558
Meter communications network Meters communicate to the substations via powerline carrier. Substations communicate...
Head end server None. $0
Meter data analysis system None.
Other IT systems and applications

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.

Electric distribution system % Description
Portion of distribution system with SCADA due to SGIG/SGD program
Portion of distribution system with DA due to SGIG/SGD program 100.00% 85%
DA devices installed and operational Quantity* Description Cost
Automated feeder switches 67 SEL automation controllers and S&C Type M motor operated switches. $577,825
Automated capacitors
Automated regulators
Feeder monitors
Remote fault indicators
Transformer monitors (line)
Smart relays 85
Fault current limiter
Other devices
SCADA and DA communications network Cost
Communications equipment and SCADA $321,486
Distribution management systems integration Integrated Description
AMI
Outage management system
Distributed energy resource interface
Other
Distribution automation features / functionality Function enabled Description
Fault location, isolation and service restoration (FLISR) Yes SEL automation controllers and S&C Type M motor operated switches.
Voltage optimization
Feeder peak load management
Microgrids
Other functions

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.