FirstEnergy New Jersey
AMI smart meters installed and operational | Quantity* | Cost |
---|---|---|
Total | 0 | $0 |
Residential | 0 | |
Commercial | 0 | |
Industrial | 0 |
AMI smart meter features operational | Feature enabled | # of meters with feature |
---|---|---|
Interval reads | No | 0 |
Remote connection/disconnection | No | 0 |
Outage detection/reporting | No | 0 |
Tamper detection | No | 0 |
AMI communication networks and data systems | Description | Cost |
---|---|---|
Backhaul communications description | Leased backhaul that transports data/control commands between data concentrators in the field and the IDER DLC Integrated Control Platform hosted at a secure data center by SGMI vendor BPLG. Each data concentrator (BPLG DC 1000) transmits the data to the Data Center via a Verizon cellular backhaul. | $0 |
Meter communications network | ||
Head end server | $0 | |
Meter data analysis system | ||
Other IT systems and applications |
Web portal deployed and operational | Quantity* | Description |
---|---|---|
Customers with access to web portal | 19,304 | |
Customers enrolled in web portal | 664 | Provides interface to program activity and participation levels. Residential customers only. Activity = what has been going on with the program; # events, etc.. Participation = # times the device has been called to participate in an event; the duration; kwh avoided, etc.. |
Customer systems installed and operational | Quantity* | Description | Cost |
---|---|---|---|
Communication networks and home area networks | N/A | N/A | |
In home displays | 0 | $0 | |
Energy management device | 0 | N/A | |
Direct load control devices | 17,221 | IDER DLC load control devices - 1) the deployment includes the implementation of the IDER DLC Platform which manages the load control devices; 2) more than one load control device may be used at a participating customer premise; 3) numbers represent DLC bundle which include a BPLG DLC 1000 controller and a BPLG TS-100 temperature sensor). | $13,530,288 |
Programmable communicating thermostats | 0 | $0 | |
Smart appliances | $0 |
Customer system communication networks | Description |
---|---|
Network characteristics within customer premise |
Pricing program | Customers with access | Customers enrolled | Description |
---|---|---|---|
$25 gift card upon initial program enrollment | 19,304 | 19,304 | Program solicits participants from identified program circuits; participants are rewarded (gift card) and experience the benefits of lowered consumption during control events. Program Participation relates to the number of deployed and participating controllers. These customers participate by allowing utility to directly control their A/C loads based upon predetermined program rules. Participants are residential customers. |
$25 gift card after first season of participation | 7,088 | 7,088 | Program participants complete first season; continuing participants are rewarded (gift card) and experience the benefits of lowered consumption during control events. Program Participation limited to the number of deployed controllers needed to maintain program demand reduction objectives. |
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.