Recipient information Input
Total number of customers served by utility / utilities supporting the project 119,685
Total number of residential customers served by utility / utilities supporting the project 94,827
Total number of commercial customers served by utility / utilities supporting the project 24,858
Total number of industrial customers served by utility / utilities supporting the project
Total number of AMI smart meters installed and operational prior to the SGIG/SGD program
AMI smart meters installed and operational Quantity* Cost
Total
Residential
Commercial
Industrial
AMI smart meter features operational Feature enabled # of meters with feature
Interval reads N/A
Remote connection/disconnection N/A
Outage detection/reporting N/A
Tamper detection N/A
AMI communication networks and data systems Description Cost
Backhaul communications description
Meter communications network
Head end server
Meter data analysis system
Other IT systems and applications
Web portal deployed and operational Quantity* Description
Customers with access to web portal
Customers enrolled in web portal
Customer systems installed and operational Quantity* Description Cost
Communication networks and home area networks N/A N/A
In home displays
Energy management device 0 It is not likely that there will be an Energy Management Systems (EMS) installed... N/A
Direct load control devices
Programmable communicating thermostats 54 A small pilot of 54 Honeywell WiFi 9000, 10 Honeywell VisionPro and 4 ecobee Smart... $91,676
Smart appliances
Customer system communication networks Description
Network characteristics within customer premise
Pricing program Customers with access Customers enrolled Description
PeakSmart Commercial Rate1,0479
Distributed energy resources Quantity* Capacity Description Cost
Distributed generation 0 0 kW $0
Energy storage kW
Plug in electric vehicle charging points kW
Distributed energy resource interface N/A N/A The project did NOT involve installing utility-owned distributed generation, rather... $0

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.

Recipient information Input
Total number of customers served by utility / utilities supporting the project 119,685
Total number of residential customers served by utility / utilities supporting the project 94,827
Total number of commercial customers served by utility / utilities supporting the project 24,858
Total number of industrial customers served by utility / utilities supporting the project
Total number of distribution circuits within utility service territory 138
Total number of distribution substations 18
Portion of distribution system with SCADA prior to SGIG/SGD program
Portion of distribution system with distribution automation (DA) prior to SGIG/SGD program
Electric distribution system % Description
Portion of distribution system with SCADA due to SGIG/SGD program 11.20% The SCADA system, as a part of the Automated Distribution System, was deployed...
Portion of distribution system with DA due to SGIG/SGD program 11.20% This project deployed the Automated Distribution System into 29 of the 257 electric...
DA devices installed and operational Quantity* Description Cost
Automated feeder switches 93 AThe DA devices are comprised of automated reclosers and motor operated switches (broadly termed "automated switches") together with the associated controls and communication equipment. $2,953,995
Automated capacitors 0 $5,420
Automated regulators 0
Feeder monitors
Remote fault indicators 0
Transformer monitors (line)
Smart relays
Fault current limiter
Other devices 93 $0
SCADA and DA communications network Cost
Communications equipment and SCADA $2,744,972
Distribution management systems integration Integrated Description
AMI 0
Outage management system No
Distributed energy resource interface No The project did NOT involve installing utility-owned distributed generation, rather...
Other
Distribution automation features / functionality Function enabled Description
Fault location, isolation and service restoration (FLISR) Yes The utilization of automated processes to monitor and control distribution devices...
Voltage optimization No Voltage optimization is a corollary function associated with the ability to monitor...
Feeder peak load management
Microgrids
Other functions

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.