Total number of customers served by utility / utilities supporting the project | 84,343 |
Total number of residential customers served by utility / utilities supporting the project | 71,477 |
Total number of commercial customers served by utility / utilities supporting the project | 12,645 |
Total number of industrial customers served by utility / utilities supporting the project | 221 |
Total number of AMI smart meters installed and operational prior to the SGIG/SGD program | 0 |
AMI smart meters installed and operational | Quantity* | Cost |
---|---|---|
Total | 0 | $22,977,752 |
Residential | 73,871 | |
Commercial | 11,370 | |
Industrial | 341 |
AMI smart meter features operational | Feature enabled | # of meters with feature |
---|---|---|
Interval reads | Yes | 85,582 |
Remote connection/disconnection | Yes | 85,582 |
Outage detection/reporting | Yes | 85,582 |
Tamper detection | Yes | 85,582 |
AMI communication networks and data systems | Description | Cost |
---|---|---|
Backhaul communications description | Tropos WiFi mesh into Ethernet fiber network | $2,314,668 |
Meter communications network | 900 Mhz mesh to Itron Cell Relay Collectors | |
Head end server | Itron Open Way Collection Engine | $7,486,467 |
Meter data analysis system | Data warehouse and business intelligence tools planned. Specific selections not yet made. | |
Other IT systems and applications | Enterprise Service Bus |
Web portal deployed and operational | Quantity* | Description |
---|---|---|
Customers with access to web portal | 73,871 | |
Customers enrolled in web portal | 926 | GWP and Opower have made utility-specific modifications to the Opower web-portal including: updated FAQ's, a customer e-mail template, and links to specific energy efficiency programs offered by GWP. The Opower platform also allows customers to view their interval electric usage data online. In addition, GWP continues it's partnership with Opower, Facebook and the National Resources Defense Council in a pilot to engage customers via a social media energy application. The application gives customers the ability to share and compare their energy usage with friends on Facebook. |
Customer systems installed and operational | Quantity* | Description | Cost |
---|---|---|---|
Communication networks and home area networks | N/A | N/A | |
In home displays | 81 | GWP signed a contract with CEIVA Logic to conduct a pilot not to exceed 120 In Home Displays (IHD’s). Currently there are 81 people participating in the CEIVA pilot, 70 General Public and 11 City/Ceiva people. | $5,630 |
Energy management device | 0 | N/A | |
Direct load control devices | 0 | $0 | |
Programmable communicating thermostats | 0 | $0 | |
Smart appliances | 0 | $0 |
Customer system communication networks | Description |
---|---|
Network characteristics within customer premise |
Pricing program | Customers with access | Customers enrolled | Description |
---|---|---|---|
N/A | 0 | 0 | N/A |
Distributed energy resources | Quantity* | Capacity | Description | Cost |
---|---|---|---|---|
Distributed generation | 0 | 0 kW | N/A | $0 |
Energy storage | 162 | 1,270 kW | $3,199,602 | |
Plug in electric vehicle charging points | 0 | 0 kW | $0 | |
Distributed energy resource interface | N/A | N/A | $0 |
Recipient information | Input |
---|---|
Total number of customers served by utility / utilities supporting the project | 84,343 |
Total number of residential customers served by utility / utilities supporting the project | 71,477 |
Total number of commercial customers served by utility / utilities supporting the project | 12,645 |
Total number of industrial customers served by utility / utilities supporting the project | 221 |
Total number of distribution circuits within utility service territory | 114 |
Total number of distribution substations | 12 |
Portion of distribution system with SCADA prior to SGIG/SGD program | 0 |
Portion of distribution system with distribution automation (DA) prior to SGIG/SGD program | 0 |
Electric distribution system | % | Description |
---|---|---|
Portion of distribution system with SCADA due to SGIG/SGD program | 100.00% | SCADA was implemented system wide prior to the start of the project. |
Portion of distribution system with DA due to SGIG/SGD program | 0% | Currently GWP does not have any portion of the electrical system with DA. GWP started the installation of the various components of DA in June 2011. It is scheduled to complete the DA Pilot Project by March 2015. This project will cover roughly about 5% of the electrical system with DA. After the successful completion of the DA Pilot Project, GWP has a plan to expand the DA to include the entire distribution system. |
DA devices installed and operational | Quantity* | Description | Cost |
---|---|---|---|
Automated feeder switches | 8 | Capacitor Banks with automated controllers. Plan to start installation: 1st Quarter 2014 Smart Protection Relays. Plan to start installation: 1st Quarter 2014 Disturbance Monitoring Relays. Plan to start installation: 1st Quarter 2014 | $553,380 |
Automated capacitors | 0 | $42,269 | |
Automated regulators | 0 | $0 | |
Feeder monitors | 0 | $116,752 | |
Remote fault indicators | 0 | $0 | |
Transformer monitors (line) | 0 | $0 | |
Smart relays | 4 | ||
Fault current limiter | 0 | $0 | |
Other devices | 0 | $0 |
SCADA and DA communications network | Cost |
---|---|
Communications equipment and SCADA | $471,069 |
Distribution management systems integration | Integrated | Description |
---|---|---|
AMI | No | Planned but not yet selected |
Outage management system | No | Planned but not yet selected |
Distributed energy resource interface | No | |
Other | No | Enterprise Service Bus |
Distribution automation features / functionality | Function enabled | Description |
---|---|---|
Fault location, isolation and service restoration (FLISR) | No | These features have not yet been enabled. |
Voltage optimization | No | These features have not yet been enabled |
Feeder peak load management | No | |
Microgrids | No | |
Other functions | No |
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).