Recipient information Input
Total number of customers served by utility / utilities supporting the project 84,343
Total number of residential customers served by utility / utilities supporting the project 71,477
Total number of commercial customers served by utility / utilities supporting the project 12,645
Total number of industrial customers served by utility / utilities supporting the project 221
Total number of AMI smart meters installed and operational prior to the SGIG/SGD program
AMI smart meters installed and operational Quantity* Cost
Total 85,582 $22,977,752
Residential 73,871
Commercial 11,370
Industrial 341
AMI smart meter features operational Feature enabled # of meters with feature
Interval reads 1 85,582
Remote connection/disconnection Yes 85,582
Outage detection/reporting Yes 85,582
Tamper detection Yes 85,582
AMI communication networks and data systems Description Cost
Backhaul communications description Tropos WiFi mesh into Ethernet fiber network $2,314,668
Meter communications network 900 Mhz mesh to Itron Cell Relay Collectors
Head end server Itron Open Way Collection Engine $7,486,467
Meter data analysis system Data warehouse and business intelligence tools planned. Specific selections not...
Other IT systems and applications Enterprise Service Bus
Web portal deployed and operational Quantity* Description
Customers with access to web portal 73,871
Customers enrolled in web portal 926 GWP and Opower have made utility-specific modifications to the Opower web-portal...
Customer systems installed and operational Quantity* Description Cost
Communication networks and home area networks N/A N/A
In home displays 81 GWP signed a contract with CEIVA Logic to conduct a pilot not to exceed 120 In... $5,630
Energy management device N/A
Direct load control devices
Programmable communicating thermostats
Smart appliances
Customer system communication networks Description
Network characteristics within customer premise
Pricing program Customers with access Customers enrolled Description
N/A00
N/A
N/A00
N/A
N/A00
N/A
Distributed energy resources Quantity* Capacity Description Cost
Distributed generation kW N/A
Energy storage 162 1,270 kW This project will install up to 1.5 MW of smart grid enabled thermal energy storage... $3,199,602
Plug in electric vehicle charging points kW
Distributed energy resource interface N/A N/A

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.

Recipient information Input
Total number of customers served by utility / utilities supporting the project 84,343
Total number of residential customers served by utility / utilities supporting the project 71,477
Total number of commercial customers served by utility / utilities supporting the project 12,645
Total number of industrial customers served by utility / utilities supporting the project 221
Total number of distribution circuits within utility service territory 114
Total number of distribution substations 12
Portion of distribution system with SCADA prior to SGIG/SGD program
Portion of distribution system with distribution automation (DA) prior to SGIG/SGD program
Electric distribution system % Description
Portion of distribution system with SCADA due to SGIG/SGD program 100.00% SCADA was implemented system wide prior to the start of the project.
Portion of distribution system with DA due to SGIG/SGD program 0.00% Currently GWP does not have any portion of the electrical system with DA. GWP...
DA devices installed and operational Quantity* Description Cost
Automated feeder switches 8 Capacitor Banks with automated controllers. Plan to start installation: 1st Quarter 2014 Smart Protection Relays. Plan to start installation: 1st Quarter 2014 Disturbance Monitoring Relays. Plan to start installation: 1st Quarter 2014 $553,380
Automated capacitors 0 $42,269
Automated regulators 0 $0
Feeder monitors 0 $116,752
Remote fault indicators 0
Transformer monitors (line)
Smart relays 4
Fault current limiter
Other devices 0 $0
SCADA and DA communications network Cost
Communications equipment and SCADA $471,069
Distribution management systems integration Integrated Description
AMI Planned but not yet selected
Outage management system Planned but not yet selected
Distributed energy resource interface
Other Enterprise Service Bus
Distribution automation features / functionality Function enabled Description
Fault location, isolation and service restoration (FLISR) No These features have not yet been enabled.
Voltage optimization No These features have not yet been enabled
Feeder peak load management
Microgrids
Other functions

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.