Data reported by:

Central Lincoln People's Utility District

Smart Grid Team 2020 Program
Recipient information Input
Total number of customers served by utility / utilities supporting the project 38,465
Total number of residential customers served by utility / utilities supporting the project 32,736
Total number of commercial customers served by utility / utilities supporting the project 5,547
Total number of industrial customers served by utility / utilities supporting the project 182
Total number of AMI smart meters installed and operational prior to the SGIG/SGD program
AMI smart meters installed and operational Quantity* Cost
Total 38,620 $10,503,380
Residential 37,380
Commercial 1,175
Industrial 65
AMI smart meter features operational Feature enabled # of meters with feature
Interval reads 1 38,620
Remote connection/disconnection Yes 37,380
Outage detection/reporting Yes 38,620
Tamper detection Yes 38,620
AMI communication networks and data systems Description Cost
Backhaul communications description The SGIG allowed Central Lincoln to upgrade its fiber optic communications system... $4,837,386
Meter communications network The SGIG allowed Central Lincoln to upgrade the planned PLC meter communication...
Head end server The SGIG allowed Central Lincoln to upgrade to a more robust Landis+Gyr Gridstream... $680,578
Meter data analysis system
Other IT systems and applications
Web portal deployed and operational Quantity* Description
Customers with access to web portal 38,620
Customers enrolled in web portal 1,345 The energy management customer web portal is available to all customers with AMI...
Customer systems installed and operational Quantity* Description Cost
Communication networks and home area networks N/A No Home Area Network devices were deployed this Quarter. Central Lincoln has... N/A
In home displays 46 Central Lincoln has a total of 46 in-home displays in the field. The AMI team... $21,672
Energy management device N/A
Direct load control devices 0 Direct Load Control Devices will not be implemented during the Project time frame.... $0
Programmable communicating thermostats
Smart appliances
Customer system communication networks Description
Network characteristics within customer premise No Home Area Network devices were deployed this Quarter. Central Lincoln has...
Distributed energy resources Quantity* Capacity Description Cost
Distributed generation kW
Energy storage kW
Plug in electric vehicle charging points kW
Distributed energy resource interface N/A N/A

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.

Recipient information Input
Total number of customers served by utility / utilities supporting the project 38,465
Total number of residential customers served by utility / utilities supporting the project 32,736
Total number of commercial customers served by utility / utilities supporting the project 5,547
Total number of industrial customers served by utility / utilities supporting the project 182
Total number of distribution circuits within utility service territory 80
Total number of distribution substations 28
Portion of distribution system with SCADA prior to SGIG/SGD program
Portion of distribution system with distribution automation (DA) prior to SGIG/SGD program
Electric distribution system % Description
Portion of distribution system with SCADA due to SGIG/SGD program 100.00% To date, a total of 25 out of 25 substations are equipped with the new SCADA ...
Portion of distribution system with DA due to SGIG/SGD program 9.00% The utility’s DA devices include 17 feeder switches (14 of which monitor current...
DA devices installed and operational Quantity* Description Cost
Automated feeder switches 17 The utility’s DA devices include 17 feeder switches (14 of which monitor current and voltage), 7 distribution transformer monitors, 2 regulators and 8 fault indicators. $913,416
Automated capacitors
Automated regulators 2
Feeder monitors 14
Remote fault indicators
Transformer monitors (line)
Smart relays
Fault current limiter
Other devices
SCADA and DA communications network Cost
Communications equipment and SCADA $764,700
Distribution management systems integration Integrated Description
AMI
Outage management system As Central Lincoln has migrated from the legacy SCADA system to a new SCADA/OMS...
Distributed energy resource interface
Other
Distribution automation features / functionality Function enabled Description
Fault location, isolation and service restoration (FLISR) No No portion of the FLISR was installed this Quarter. All DA devices must be operational...
Voltage optimization Yes Central Lincoln deployed the meter data management system that will be helpful...
Feeder peak load management
Microgrids
Other functions

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.