Data reported by:

CCET

Technology Solutions for Wind Integration
Web portal deployed and operational Quantity* Description
Customers with access to web portal 0
Customers enrolled in web portal 0
Customer systems installed and operational Quantity* Description Cost
Communication networks and home area networks N/A CCET is leveraging the customer systems within the Pecan Street demonstration... N/A
In home displays 0 CCET is leveraging the customer systems within the Pecan Street demonstration... $0
Energy management device 0 CCET is leveraging the customer systems within the Pecan Street demonstration... N/A
Direct load control devices 0 $0
Programmable communicating thermostats 1,385 CCET is utilizing PCTs (and gateways) that TXU Energy has installed in customer... $801,000
Smart appliances 0 CCET is leveraging the customer systems within the Pecan Street demonstration... $0
Customer system communication networks Description
Network characteristics within customer premise CCET is leveraging the customer systems within the Pecan Street demonstration...
Pricing program Customers with access Customers enrolled Description
Tiered + Wind Enhancement + CPP6060
Distributed energy resources Quantity* Capacity Description Cost
Distributed generation 4 2,570 kW Group NIRE is facilitating the deployment and testing of various wind turbine... $0
Energy storage 1 1,000 kW $1,995,933
Plug in electric vehicle charging points 0 0 kW $0
Distributed energy resource interface N/A N/A CCET is leveraging DER systems within the Pecan Street demonstration project,... $0

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.

Electric distribution system % Description
Portion of distribution system with SCADA due to SGIG/SGD program 0.00% The project is not funding or leveraging funding of the SCADA system
Portion of distribution system with DA due to SGIG/SGD program 0.00% The project is not funding or leveraging funding of the DA system
DA devices installed and operational Quantity* Description Cost
Automated feeder switches 0 The project is not funding or leveraging funding of the DA system $0
Automated capacitors 0 $0
Automated regulators 0 $0
Feeder monitors 6 $89,128
Remote fault indicators 0
Transformer monitors (line) 0 $0
Smart relays 0
Fault current limiter 0 $20,658
Other devices $0
SCADA and DA communications network Cost
Communications equipment and SCADA $0
Distribution management systems integration Integrated Description
AMI 0
Outage management system No
Distributed energy resource interface No CCET is leveraging DER systems within the Pecan Street demonstration project,...
Other No
Distribution automation features / functionality Function enabled Description
Fault location, isolation and service restoration (FLISR) No The project is not funding or leveraging funding of the FLISR system
Voltage optimization No The project is not funding or leveraging funding of any voltage optimization ...
Feeder peak load management No The project is not funding or leveraging funding of any feeder peak load management...
Microgrids No The project is not funding or leveraging funding of any microgrid development...
Other functions No The project is not funding or leveraging funding of any other DA applications...

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.

Electric transmission system Portion Description
Portion of transmission system covered by phasor measurement systems 17.81%
Phasor measurement systems Quantity* Description Cost
PMUs 19 ERCOT currently has 69 PMUs installed in its service territory, and there are... $953,432
Phasor data concentrators 6 ERCOT has a PDC and three reporting utilities each have a PDC. TTU has installed... $93,619
Communications network The utilities are considering an upgrade of their communications networks in the... $319,619
Other transmission assets   Quantity* Description Cost
Dynamic Capability Rating System (DCRS)
- Transmission Lines
0 $0
Other transmission assets 1 Pecan Street is upgrading one of its substations to support the homes in its community,... $4,449,432
Other transmission assets $0
Other transmission assets $0
Advanced transmission applications operational    Operational Description Cost
Angle/frequency monitoring 1 The real-time dynamics monitoring system (RTDMS) is being enhanced as part of the project. ERCOT has the RTDMS and the utilities can remotely access this system. $714,857
Post-mortem analysis (including compliance monitoring) No
Voltage stability monitoring Yes
Thermal overload monitoring No
Improved state estimation No
Steady-state model benchmarking No
DG/IPP applications No
Power system restoration No

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.