Recipient information | Input |
---|---|
Total number of customers served by utility / utilities supporting the project | 51,858 |
Total number of residential customers served by utility / utilities supporting the project | 44,833 |
Total number of commercial customers served by utility / utilities supporting the project | 6,560 |
Total number of industrial customers served by utility / utilities supporting the project | 199 |
Total number of AMI smart meters installed and operational prior to the SGIG/SGD program | 0 |
AMI smart meters installed and operational | Quantity* | Cost |
---|---|---|
Total | 0 | $14,137,052 |
Residential | 45,243 | |
Commercial | 6,483 | |
Industrial | 202 |
AMI smart meter features operational | Feature enabled | # of meters with feature |
---|---|---|
Interval reads | Yes | 51,928 |
Remote connection/disconnection | Yes | 45,150 |
Outage detection/reporting | Yes | 51,835 |
Tamper detection | Yes | 51,835 |
AMI communication networks and data systems | Description | Cost |
---|---|---|
Backhaul communications description | 410 radio Tropos city-wide Wifi mesh network, and Cisco 10 Gigabit Ethernet with 59 gateways to fiber optic network. | $4,797,327 |
Meter communications network | Trilliant AMI mesh radio system. 200 collector radios. 200 Installed. | |
Head end server | Tropos Control for Wifi network; Trilliant Control system for AMI network | $6,001,366 |
Meter data analysis system | Gridiant Grid View data analysis software in operation. | |
Other IT systems and applications | Telvent OASyS EMS and SCADA in service. Oracle Work and Asset Management system installed 12-2010. SCADA upgrade is complete and testing and integration continues. |
Web portal deployed and operational | Quantity* | Description |
---|---|---|
Customers with access to web portal | 45,150 | |
Customers enrolled in web portal | 2,910 | A customer Web Portal that displays electric meter data was developed by OPower and is available to all residential customers as of July 2012. An Oracle customer portal with more features has been selected by BWP and will be rolled out after the CIS upgrade project is complete. |
Customer systems installed and operational | Quantity* | Description | Cost |
---|---|---|---|
Communication networks and home area networks | N/A | TBD | N/A |
In home displays | 50 | CEVIA was selected for In-Home displays. Program is in-service on a demonstration basis with 50 customers. | $0 |
Energy management device | 0 | N/A | |
Direct load control devices | 0 | $0 | |
Programmable communicating thermostats | 0 | $0 | |
Smart appliances | 0 | $0 |
Customer system communication networks | Description |
---|---|
Network characteristics within customer premise | TBD |
Pricing program | Customers with access | Customers enrolled | Description |
---|---|---|---|
Net Metering | 0 | 0 | All customers have access to net-metering if they conform to our interconnection agreement. Currently, about 131 customers have solar systems and have net-metering in place. |
Time of Use Rate | 200 | 200 | TOU required for all Commercial and Industrial customers greater than 250 KVA service. TOU not available for residential or smaller C&I at this time. Current TOU rates are as follows: LARGE GENERAL SERVICE SECONDARY, 250 to 1,000 KVA Customers serviced below 2.4 kV qualify for secondary service. Energy charge (a) Summer On-Peak $0.1459 kWh (b) Summer Mid-Peak $0.0987 kWh (c) Summer Off-Peak $0.0729 kWh (d) Winter Mid-Peak $0.0987 kWh (e) Winter Off-Peak $0.0729 kWh Definitions: Summer: June 1 through October 31. Winter: November 1 through May 31. On-Peak: Summer Weekdays, noon to 6 pm, except holidays. Mid-Peak: Weekdays, 8 am to noon, 6 pm to 11 pm, except holidays. Off-Peak: All remaining hours. Customers serviced at 2.4 kV and above, and customers with only one level of transformation below 34.5 kV (excepting 12kV/4kV transformations done as part of a voltage conversion effort) qualify for primary service. (4) Energy charge (a) Summer On-Peak $0.1352 kWh (b) Summer Mid-Peak $0.0915 kWh (c) Summer Off-Peak $0.0676 kWh (d) Winter Mid-Peak $0.0915 kWh (e) Winter Off-Peak $0.0676 kWh SECTION 7. SCHEDULE XL-TOU SECONDARY EXTRA LARGE GENERAL SERVICE SECONDARY OVER 1,000 KVA Customers serviced below 2.4 kV qualify for secondary service. (4) Energy charge (a) Summer On-Peak $0.1459 kWh (b) Summer Mid-Peak $0.0987 kWh (c) Summer Off-Peak $0.0729 kWh (d) Winter Mid-Peak $0.0987 kWh (e) Winter Off-Peak $0.0729 kWh Customers serviced at 2.4 kV and above, and customers with only one level of transformation below 34.5 kV (excepting 12kV/4kV transformations done as part of a voltage conversion effort) qualify for primary service. (4) Energy charge (a) Summer On-Peak $0.1352 kWh (b) Summer Mid-Peak $0.0915 kWh (c) Summer Off-Peak $0.0676 kWh (d) Winter Mid-Peak $0.0915 kWh (e) Winter Off-Peak $0.0676 kWh |
Distributed energy resources | Quantity* | Capacity | Description | Cost |
---|---|---|---|---|
Distributed generation | 0 | 0 kW | $0 | |
Energy storage | 34 | 230 kW | $85,801 | |
Plug in electric vehicle charging points | 11 | 77 kW | $143,929 | |
Distributed energy resource interface | N/A | N/A | $0 |
Recipient information | Input |
---|---|
Total number of customers served by utility / utilities supporting the project | 51,858 |
Total number of residential customers served by utility / utilities supporting the project | 44,833 |
Total number of commercial customers served by utility / utilities supporting the project | 6,560 |
Total number of industrial customers served by utility / utilities supporting the project | 199 |
Total number of distribution circuits within utility service territory | 118 |
Total number of distribution substations | 14 |
Portion of distribution system with SCADA prior to SGIG/SGD program | 0 |
Portion of distribution system with distribution automation (DA) prior to SGIG/SGD program | 0 |
Electric distribution system | % | Description |
---|---|---|
Portion of distribution system with SCADA due to SGIG/SGD program | 100.00% | SCADA monitors entire BWP electric system |
Portion of distribution system with DA due to SGIG/SGD program | 94.00% | Auto reclosers installed on 93 of 93 4 KV feeders and 37 of 45 12 KV feeders. A total of 130 feeders will have auto reclosers installed. |
DA devices installed and operational | Quantity* | Description | Cost |
---|---|---|---|
Automated feeder switches | 0 | Auto Reclosers on feeder breakers. Reclosers automatically close feeder circuit breakers after short duration fault conditions that self clear themselves. This should reduce outage duration and truck rolls on outages caused by palm fronds and mylar balloons. | $0 |
Automated capacitors | 0 | $0 | |
Automated regulators | 130 | $0 | |
Feeder monitors | 0 | $1,822,585 | |
Remote fault indicators | 0 | $0 | |
Transformer monitors (line) | 0 | $0 | |
Smart relays | 0 | ||
Fault current limiter | 0 | $0 | |
Other devices | 0 | $0 |
SCADA and DA communications network | Cost |
---|---|
Communications equipment and SCADA | $1,323,276 |
Distribution management systems integration | Integrated | Description |
---|---|---|
AMI | Yes | |
Outage management system | No | Telvent Responder OMS in place (7-2010). OMS is integrated with MDMS, GIS and MDMS. This provides Grid Operators and Customer Service Representatives with near real time outage data. This will help reduce outage duration, improve reliability, and improve the quality of information provided to customers regarding outage restoration and improve customer satisfaction. |
Distributed energy resource interface | No | DG is primarily Customer owned Solar PV roof top systems. Energy Storage is 34 Ice Bear units. PEV charging Demo has deployed 11 stations in public accessible spaces. |
Other | No | Telvent OASyS EMS and SCADA in service. Oracle Work and Asset Management system installed 12-2010. SCADA upgrade is complete and testing and integration continues. |
Distribution automation features / functionality | Function enabled | Description |
---|---|---|
Fault location, isolation and service restoration (FLISR) | No | |
Voltage optimization | No | |
Feeder peak load management | No | TBD |
Microgrids | No | |
Other functions | No | TBD |
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.