Recipient information Input
Total number of customers served by utility / utilities supporting the project 51,858
Total number of residential customers served by utility / utilities supporting the project 44,833
Total number of commercial customers served by utility / utilities supporting the project 6,560
Total number of industrial customers served by utility / utilities supporting the project 199
Total number of AMI smart meters installed and operational prior to the SGIG/SGD program
AMI smart meters installed and operational Quantity* Cost
Total 51,928 $14,137,052
Residential 45,243
Commercial 6,483
Industrial 202
AMI smart meter features operational Feature enabled # of meters with feature
Interval reads 1 51,928
Remote connection/disconnection Yes 45,150
Outage detection/reporting Yes 51,835
Tamper detection Yes 51,835
AMI communication networks and data systems Description Cost
Backhaul communications description 410 radio Tropos city-wide Wifi mesh network, and Cisco 10 Gigabit Ethernet with... $4,797,327
Meter communications network Trilliant AMI mesh radio system. 200 collector radios. 200 Installed.
Head end server Tropos Control for Wifi network; Trilliant Control system for AMI network $6,001,366
Meter data analysis system Gridiant Grid View data analysis software in operation.
Other IT systems and applications Telvent OASyS EMS and SCADA in service. Oracle Work and Asset Management system...
Web portal deployed and operational Quantity* Description
Customers with access to web portal 45,150
Customers enrolled in web portal 2,910 A customer Web Portal that displays electric meter data was developed by OPower...
Customer systems installed and operational Quantity* Description Cost
Communication networks and home area networks N/A TBD N/A
In home displays 50 CEVIA was selected for In-Home displays. Program is in-service on a demonstration... $0
Energy management device N/A
Direct load control devices $0
Programmable communicating thermostats $0
Smart appliances $0
Customer system communication networks Description
Network characteristics within customer premise TBD
Pricing program Customers with access Customers enrolled Description
Time of Use Rate200200
Net Metering 00
Distributed energy resources Quantity* Capacity Description Cost
Distributed generation 0 0 kW $0
Energy storage 34 230 kW This project includes deployment of Ice EnergyÕs Ice Bear distributed energy... $85,801
Plug in electric vehicle charging points 11 77 kW Plug-in Electric Vehicle (PEV) technology is evolving rapidly and is anticipated... $143,929
Distributed energy resource interface N/A N/A DG is primarily Customer owned Solar PV roof top systems. Energy Storage is 34... $0

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.

Recipient information Input
Total number of customers served by utility / utilities supporting the project 51,858
Total number of residential customers served by utility / utilities supporting the project 44,833
Total number of commercial customers served by utility / utilities supporting the project 6,560
Total number of industrial customers served by utility / utilities supporting the project 199
Total number of distribution circuits within utility service territory 118
Total number of distribution substations 14
Portion of distribution system with SCADA prior to SGIG/SGD program
Portion of distribution system with distribution automation (DA) prior to SGIG/SGD program
Electric distribution system % Description
Portion of distribution system with SCADA due to SGIG/SGD program 100.00% SCADA monitors entire BWP electric system
Portion of distribution system with DA due to SGIG/SGD program 94.00% Auto reclosers installed on 93 of 93 4 KV feeders and 37 of 45 12 KV feeders....
DA devices installed and operational Quantity* Description Cost
Automated feeder switches Auto Reclosers on feeder breakers. Reclosers automatically close feeder circuit breakers after short duration fault conditions that self clear themselves. This should reduce outage duration and truck rolls on outages caused by palm fronds and mylar balloo... $0
Automated capacitors $0
Automated regulators 130 $0
Feeder monitors $1,822,585
Remote fault indicators
Transformer monitors (line) $0
Smart relays
Fault current limiter 0 $0
Other devices
SCADA and DA communications network Cost
Communications equipment and SCADA $1,323,276
Distribution management systems integration Integrated Description
AMI 1
Outage management system Telvent Responder OMS in place (7-2010). OMS is integrated with MDMS, GIS and...
Distributed energy resource interface DG is primarily Customer owned Solar PV roof top systems. Energy Storage is 34...
Other Telvent OASyS EMS and SCADA in service. Oracle Work and Asset Management system...
Distribution automation features / functionality Function enabled Description
Fault location, isolation and service restoration (FLISR)
Voltage optimization
Feeder peak load management No TBD
Microgrids
Other functions No TBD

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.