AMI smart meters installed and operational Quantity* Cost
Total 30,692 $16,813,968
Residential 27,374
Commercial 2,963
Industrial 355
AMI smart meter features operational Feature enabled # of meters with feature
Interval reads 1 30,692
Remote connection/disconnection Yes 12,994
Outage detection/reporting Yes 14,114
Tamper detection Yes 9,374
AMI communication networks and data systems Description Cost
Backhaul communications description Subproject 1: The fiber backhaul network was extended into the subproject’s... $2,524,287
Meter communications network Subproject 1: Advanced metering infrastructure (AMI) meters will use an Itron...
Head end server Subproject 1: The OpenWay Collection Engine does all of the scheduled and non-scheduled... $1,654,361
Meter data analysis system Subproject 1: Open Way Reporting System (ORS) is included in the Open Way advanced...
Other IT systems and applications n/a
Web portal deployed and operational Quantity* Description
Customers with access to web portal 16,896
Customers enrolled in web portal 16,870 Subproject 1: Customer web portals display energy usage from advanced metering...
Customer systems installed and operational Quantity* Description Cost
Communication networks and home area networks N/A Subproject 1: A customer’s home area network is created by their thermostats... N/A
In home displays 1,443 Subproject 4: The in-home displays, paired with Advanced Metering Infrastructure... $406,512
Energy management device 0 n/a N/A
Direct load control devices 2,137 Subproject 1: Controls for air handlers for 39 commercial buildings and controls... $8,276,768
Programmable communicating thermostats 317 Subproject 1: The thermostats have built-in displays that allow each customer... $1,003,870
Smart appliances 217 Subproject 4: Smart washer and dryer sets and smart dishwashers are controlled... $669,502
Customer system communication networks Description
Network characteristics within customer premise Subproject 1: A customer’s home area network is created by their thermostats...
Distributed energy resources Quantity* Capacity Description Cost
Distributed generation 3 71 kW n/a $2,800
Energy storage 8 5,127 kW $7,864,267
Plug in electric vehicle charging points 0 0 kW $180,000
Distributed energy resource interface N/A N/A Subproject 1: The subproject uses a Spirae platform with a commercial building... $1,078,046

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).

** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.

Electric distribution system % Description
Portion of distribution system with SCADA due to SGIG/SGD program 0.00% Subproject 3: This Supervisory Control And Data Acquisition (SCADA) system is...
Portion of distribution system with DA due to SGIG/SGD program 26.53% Subproject 5: The numerator of this equation is equal to the number of feeders...
DA devices installed and operational Quantity* Description Cost
Automated feeder switches 74 Subproject 1: Two sets of automated switchgear have been installed to switch backup generators online in the case of an outage. A total of 35 automated line switches and 13 station recloser devices have been installed and are used to identify and respond ... $3,213,500
Automated capacitors 41 $1,987,554
Automated regulators 52 $2,193,152
Feeder monitors 12,822 $2,301,274
Remote fault indicators 15
Transformer monitors (line) 400 $59,336
Smart relays 55
Fault current limiter 0 $0
Other devices 1 $1,395,420
SCADA and DA communications network Cost
Communications equipment and SCADA $3,978,398
Distribution management systems integration Integrated Description
AMI 1 Subproject 1: ACS will provide the Distribution Management System (DMS), which...
Outage management system No Subproject 5: The subproject’s Outage Management System (OMS) exists and will...
Distributed energy resource interface Yes Subproject 1: The subproject uses a Spirae platform with a commercial building...
Other No n/a
Distribution automation features / functionality Function enabled Description
Fault location, isolation and service restoration (FLISR) Yes Subproject 1: Fault Detection, Isolation, and Restoration (FDIR) within the subproject’s...
Voltage optimization Yes Subproject 1: A total of 39 voltage regulator controllers and switched capacitor...
Feeder peak load management Yes Subproject 7: The subproject uses voltage regulators, controlled remotely and...
Microgrids No Subproject 10: Depending on the location of a fault, automated switches / reclosers...
Other functions Yes Subproject 5: Power factor control to optimize system efficiency.

* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.

* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).