Title Publication Date Publishing Organizationsort ascending
Power Quality Event Notifications December, 2010 Electric Power Research Institute
Customer Portal V3.0 April, 2010 Electric Power Research Institute
Guideline for the Path to an Active Distribution Grid March, 2008 Electric Power Research Institute
Protection Engineer Plans Wide-Area Protection Schemes Based on System Model December, 2010 Electric Power Research Institute
Market Operations - Day Ahead Market Operations December, 2010 Electric Power Research Institute
Southern Company Smart Grid Demonstration Project August, 2010 Electric Power Research Institute
Reference Architecture for the Integration of Distributed Energy Resources February, 2009 Electric Power Research Institute
Contingency Analysis - Baseline December, 2010 Electric Power Research Institute
Contingency Analysis - Future Advanced December, 2010 Electric Power Research Institute
Smart Grid Related Activity in NEDO October, 2009 Electric Power Research Institute
Real-Time Pricing (RTP) - Top Level December, 2010 Electric Power Research Institute
Data Warehouse "The Utility's Smart Grid Clearinghouse V3.0 April, 2010 Electric Power Research Institute
Project Synopsis Decentralised Generation and Smart Grids May, 2008 Electric Power Research Institute
Protection Engineer Sets up Bus Protection Based on Topology of Substation December, 2010 Electric Power Research Institute
Estimating the Costs and Benefits of the Smart Grid: A Preliminary Estimate of the Investment Requirements and the Resultant Benefits of a Fully Functioning Smart Grid March, 2011 Electric Power Research Institute
Market Operations - Long Term Planning December, 2010 Electric Power Research Institute
Data Acquisition and Control (DAC) December, 2010 Electric Power Research Institute
The Role of the Smart Utility October, 2009 Electric Power Research Institute
Real-Time Pricing (RTP) - Baseline Use Case December, 2010 Electric Power Research Institute
Direct Load Control Event V3.0 May, 2010 Electric Power Research Institute
Consumer Portal Scenario P4 Customer Account Move December, 2010 Electric Power Research Institute
Connection of embedded Generation in Ireland December, 2008 Electric Power Research Institute
Protection Engineer Verifies Protection Models from IEC 61850 Configuration December, 2010 Electric Power Research Institute
The Effect on Electricity Consumption of the Commonwealth Edison Customer Application Program Pilot: Phase 1 April, 2011 Electric Power Research Institute
Market Operations - Medium and Short Term Planning December, 2010 Electric Power Research Institute

Pages