Title Publication Date Publishing Organization
Create Planning Model V0.4 December, 2010 Electric Power Research Institute
Accelerating Successful smart Grid Pilots December, 2010 World Economic Forum, Accenture
Customer Communications Portal Management December, 2010 Electric Power Research Institute
Plug-in Vehicles (PEV) - U4 - Customer enrolls in a Utility Critical Peak Pricing (CPP) program December, 2010 Electric Power Research Institute
System Engineer Creates CIM Model From IEC 61850 Configuration December, 2010 Electric Power Research Institute
The Need For Essential Consumer Protections December, 2010 National Association of State Utility Consumer Advocates
Convert Planning Model Change Request (PMCR) to Network Operations Model Change Request (NOMCR) V0.9 December, 2010 Electric Power Research Institute
Consumer Portal Scenario P7 December, 2010 Electric Power Research Institute
Plug-in Vehicles (PEV) - PR1 - Customer charges the PEV December, 2010 Electric Power Research Institute
Protection Engineer Sets up Bus Protection Based on Topology of Substation December, 2010 Electric Power Research Institute
Consumer Portal Scenario P5 Customer Sign-Up for Demand Reduction Program December, 2010 Electric Power Research Institute
Toward a Smarter Grid: ABB's Vision for the Power System of the Future December, 2010 ABB
Short Circuit Localization December, 2010 Electric Power Research Institute
Process Special Action Modeling Request (SAMR) V0.4 December, 2010 Electric Power Research Institute
Advanced Distribution Automation with DER Function December, 2010 Electric Power Research Institute
Load Shedding - By Order December, 2010 Electric Power Research Institute
Network Equivalents between EMS and Planning December, 2010 Electric Power Research Institute
Real-Time Pricing (RTP) "Customer's Building Automation Software BAS Optimization December, 2010 Electric Power Research Institute
Define Transmission Outage Schedules December, 2010 Electric Power Research Institute
EPRI Smart Grid Demonstration Two-Year Update December, 2010 Electric Power Research Institute
Earth Fault Localization December, 2010 Electric Power Research Institute
Customer Provides Photovoltaic Based Generation Source December, 2010 Electric Power Research Institute
The Smart Grid and Standards - Where are We and What do We Really Need? December, 2010 GridWise Alliance
Functional Requirements for Network Management December, 2010 Electric Power Research Institute
Customer Communications Portal Management - Telecommunications Issues December, 2010 Electric Power Research Institute

Pages