Skip to main content

Modesto Irrigation District (Smart Grid Deployment and Installation Project)

Aug. 31, 2014

U.S. Department of Energy

PDF


The Modesto Irrigation Districts (MIDs) Smart Grid Deployment and Installation project involved installation of an advanced metering infrastructure (AMI) system, a meter data management system (MDMS), and a web portal to enable customers to better manage their electricity consumption and costs. The smart meter deployment covered the Mountain House Development, a single isolated area with 3,348 customer sites. The project also included installation of distribution automation (DA) equipment for 45 of 120 circuits and deployment of a distribution management system (DMS).

The Department of Energy's Office of Electricity (OE) recognizes that our nation's sustained economic prosperity, quality of life, and global competitiveness depends on an abundance of secure, reliable, and affordable energy resources. OE leads the Department of Energy's efforts to ensure a resilient, and flexible electricity system in the United States. Learn more about OE >>

None:prod None build None