Document Summary

Click title or image to download document

Marblehead Municipal Light Department Final Report

Marblehead Municipal Light Department Final Report

Publication Date: June 2013
Publishing Organization: Municipal Light Department
Format: PDF
Keywords:

Marblehead Municipal Light,interim report

Summary:

This report is a final evaluation of Marblehead Municipal Light Department’s (MMLD’s) two-year Critical Peak Pricing (CPP) pilot program. It details the design, development, implementation and evaluation of the smart grid pilot program. MMLD was assisted by GDS Associates throughout the design and implementation of the pilot program. This evaluation report has been prepared jointly by MMLD, GDS Associates, and the Department of Energy (DOE) sponsored Technical Assistance Group (TAG), assigned to oversee and support this study. The TAG group provided invaluable contributions to the design, implementation and evaluation of the program’s results. The design of the pilot study was closely coordinated between MMLD, GDS and the TAG and documented in MMLD’s final Consumer Behavior Study Plan (CBSP), dated November 16, 2010.