SmartGrid background circleSmartGrid Circle

Click title or image to download document

East Penn Manufacturing Interim Report

December 2013
East Penn Manufacturing
East Penn Manufacturing, interim report, technology

The collaboration described in this document is being done as part of a cooperative research agreement under the Department of Energy's Smart Grid Demonstration Program. This document represents the 12 month Technical Performance Report, from July 2012 through June 2013, for the East Penn Manufacturing Smart Grid Program demonstration project.