Convert Planning Model Change Request (PMCR) to Network Operations Model Change Request (NOMCR) V0.9
Nov. 30, 2010
Electric Power Research Institute
This is a use case document that describes how a Planning Model Change Request (PMCR) is created by the Transmission Service Provider (TSP) Planning group when a future change in the operational grid is anticipated, expected or planned.