Document Summary

Click title or image to download document

Burbank Water and Power

Publication Date: November 2013
Publishing Organization: U.S. Department of Energy
Format: PDF
Keywords:

Smart Grid,Advanced Metering Infrastructure,AMI

Summary:

Burbank Water and Power’s (BWP) Smart Grid Program includes smart meters, communications infrastructure, outage management system, distribution automation, time-based rate programs, advanced customer service options, demand response, and electric vehicle charging stations. The project implements two-way communications and metering to enable customers to view their energy consumption at their convenience through systems such as Web portals. The project also includes distribution automation to enhance the reliability and quality of electric delivery and reduce operations and maintenance costs. In addition, the project includes controls for distributed energy resources to manage peak electric demand and integrate renewable resources into grid operations.