Assessment of Demand Response & Advanced Metering Staff Report (Docket AD06-2-000)

July 2006
Federal Energy Regulatory Commission
Demand Response, Smart Grid, advanced metering, FERC, report, Commission, EPAct 2005 section 1252(e)(3)

The report begins with an executive summary and introduction which describes the report structure. It then delves deeper into the issues of Demand Response and advanced metering, detailing the information that Commission staff learned regarding the six issue areas required by EPAct 2005 section 1252(e)(3).