SmartGrid background circleSmartGrid Circle

Click title or image to download document

As-Built Equipment Installation-Commissioning

November 2010
Electric Power Research Institute
Smart Grid, SCADA, Supervisory Control and Data Acquisition, EPRI Use Case Repository, control room, substation, circuit breaker

This use case describes the procedure that must be carried out when commissioning a circuit breaker in a substation via a supervisory control and data acquisition (SCADA) system to the control room.