Document Summary

Click title or image to download document

As-Built Equipment Installation-Commissioning

Publication Date: December 2010
Publishing Organization: Electric Power Research Institute
Format: PDF
Keywords:

Smart Grid,SCADA,Supervisory Control and Data Acquisition,EPRI Use Case Repository,control room,substation,circuit breaker

Summary:

This use case describes the procedure that must be carried out when commissioning a circuit breaker in a substation via a supervisory control and data acquisition (SCADA) system to the control room.