Talquin Electric Cooperative
Recipient information |
Input |
||||
Total number of customers served by utility / utilities supporting the project |
56,000 |
||||
Total number of residential customers served by utility / utilities supporting the project |
52,013 |
||||
Total number of commercial customers served by utility / utilities supporting the project |
3,735 |
||||
Total number of industrial customers served by utility / utilities supporting the project |
252 |
||||
Total number of AMI smart meters installed and operational prior to the SGIG/SGD program |
|||||
AMI smart meters installed and operational |
Quantity* |
Cost |
|||
Total |
51,635 |
$9,400,518 |
|||
Residential |
51,635 |
||||
Commercial |
0 |
||||
Industrial |
0 |
||||
AMI smart meter features operational |
Feature enabled |
# of meters with feature |
|||
Interval reads |
Yes |
51,635 |
|||
Remote connection/disconnection |
Yes |
51,635 |
|||
Outage detection/reporting |
Yes |
51,635 |
|||
Tamper detection |
Yes |
51,635 |
|||
AMI communication networks and data systems |
Description |
Cost |
|||
Backhaul communications description |
10 x Cisco Adaptive Security Appliances
1 x Cisco Router
2 x T1 Cards |
$0 |
|||
Meter communications network |
3 Base gateway Towers, Outdoor
6 Base gateway Towers, Indoor
1 Base gateway Towers, Indoor |
||||
Head end server |
|||||
Meter data analysis system |
Sensus' FlexWare application installed on Regional Network Interface (RNI) |
||||
Other IT systems and applications |
|||||
Web portal deployed and operational |
Quantity* |
Description |
|||
Customers with access to web portal |
0 |
||||
Customers enrolled in web portal |
0 |
||||
Customer systems installed and operational |
Quantity* |
Description |
Cost |
||
Communication networks and home area networks |
N/A |
N/A |
|||
In home displays |
0 |
None Will Be Deployed |
$0 |
||
Energy management device |
N/A |
||||
Direct load control devices |
0 |
None |
$0 |
||
Programmable communicating thermostats |
475 |
Talquin Has chosen to Go with the Nest Thermostat. |
$246,000 |
||
Smart appliances |
|||||
Customer system communication networks |
Description |
||||
Network characteristics within customer premise |
|||||
Distributed energy resources |
Quantity* |
Capacity |
Description |
Cost |
|
Distributed generation |
kW |
||||
Energy storage |
kW |
||||
Plug in electric vehicle charging points |
kW |
||||
Distributed energy resource interface |
N/A |
N/A |
|||
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.
Recipient information |
Input |
||||
Total number of customers served by utility / utilities supporting the project |
56,000 |
||||
Total number of residential customers served by utility / utilities supporting the project |
52,013 |
||||
Total number of commercial customers served by utility / utilities supporting the project |
3,735 |
||||
Total number of industrial customers served by utility / utilities supporting the project |
252 |
||||
Total number of distribution circuits within utility service territory |
86 |
||||
Total number of distribution substations |
25 |
||||
Portion of distribution system with SCADA prior to SGIG/SGD program |
|||||
Portion of distribution system with distribution automation (DA) prior to SGIG/SGD program |
|||||
Electric distribution system |
% |
Description |
|||
Portion of distribution system with SCADA due to SGIG/SGD program |
15.00% |
15% of the SCADA system will be affected by installing the capacitors |
|||
Portion of distribution system with DA due to SGIG/SGD program |
15.00% |
This is has not started |
|||
DA devices installed and operational |
Quantity* |
Description |
Cost |
||
Automated feeder switches |
|
||||
Automated capacitors |
55 |
$451,144 |
|||
Automated regulators |
|
||||
Feeder monitors |
|
||||
Remote fault indicators |
|
||||
Transformer monitors (line) |
|
||||
Smart relays |
|
||||
Fault current limiter |
|
||||
Other devices |
|
||||
SCADA and DA communications network |
Cost |
||||
Communications equipment and SCADA |
$161,580 |
||||
Distribution management systems integration |
Integrated |
Description |
|||
AMI |
Yes |
||||
Outage management system |
Yes |
||||
Distributed energy resource interface |
|
||||
Other |
|||||
Distribution automation features / functionality |
Function enabled |
Description |
|||
Fault location, isolation and service restoration (FLISR) |
|||||
Voltage optimization |
No |
||||
Feeder peak load management |
|||||
Microgrids |
|||||
Other functions |
|||||
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.