Sacramento Municipal Utility District
Recipient information |
Input |
||||
Total number of customers served by utility / utilities supporting the project |
672,860 |
||||
Total number of residential customers served by utility / utilities supporting the project |
525,628 |
||||
Total number of commercial customers served by utility / utilities supporting the project |
73,616 |
||||
Total number of industrial customers served by utility / utilities supporting the project |
|||||
Total number of AMI smart meters installed and operational prior to the SGIG/SGD program |
|||||
AMI smart meters installed and operational |
Quantity* |
Cost |
|||
Total |
617,502 |
$131,028,932 |
|||
Residential |
574,277 |
||||
Commercial |
43,225 |
||||
Industrial |
0 |
||||
AMI smart meter features operational |
Feature enabled |
# of meters with feature |
|||
Interval reads |
Yes |
617,502 |
|||
Remote connection/disconnection |
Yes |
574,277 |
|||
Outage detection/reporting |
Yes |
617,502 |
|||
Tamper detection |
No |
0 |
|||
AMI communication networks and data systems |
Description |
Cost |
|||
Backhaul communications description |
$4,047,394 |
||||
Meter communications network |
|||||
Head end server |
$10,117,324 |
||||
Meter data analysis system |
|||||
Other IT systems and applications |
|||||
Web portal deployed and operational |
Quantity* |
Description |
|||
Customers with access to web portal |
132,620 |
||||
Customers enrolled in web portal |
22,091 |
||||
Customer systems installed and operational |
Quantity* |
Description |
Cost |
||
Communication networks and home area networks |
N/A |
N/A |
|||
In home displays |
4,079 |
$4,449,248 |
|||
Energy management device |
261 |
N/A |
|||
Direct load control devices |
175 |
$2,940,516 |
|||
Programmable communicating thermostats |
879 |
$4,449,248 |
|||
Smart appliances |
|||||
Customer system communication networks |
Description |
||||
Network characteristics within customer premise |
|||||
| Pricing program | Customers with access |
Customers enrolled |
Description |
||
| Tiered rate with Critical Peak Pricing | 11,537 | 1,571 | |||
| Time of Use Rate | 44,348 | 5,889 | |||
| Time of Use rate with Critical Peak Pricing | 750 | 511 | |||
Distributed energy resources |
Quantity* |
Capacity |
Description |
Cost |
|
Distributed generation |
kW |
||||
Energy storage |
kW |
||||
Plug in electric vehicle charging points |
0 |
0 kW |
Up to 220 Plug-__in Electric Vehicle Charging Stations |
$0 |
|
Distributed energy resource interface |
N/A |
N/A |
|||
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.
Recipient information |
Input |
||||
Total number of customers served by utility / utilities supporting the project |
672,860 |
||||
Total number of residential customers served by utility / utilities supporting the project |
525,628 |
||||
Total number of commercial customers served by utility / utilities supporting the project |
73,616 |
||||
Total number of industrial customers served by utility / utilities supporting the project |
|||||
Total number of distribution circuits within utility service territory |
577 |
||||
Total number of distribution substations |
228 |
||||
Portion of distribution system with SCADA prior to SGIG/SGD program |
52.00% |
||||
Portion of distribution system with distribution automation (DA) prior to SGIG/SGD program |
|||||
Electric distribution system |
% |
Description |
|||
Portion of distribution system with SCADA due to SGIG/SGD program |
17.10% |
||||
Portion of distribution system with DA due to SGIG/SGD program |
2.91% |
||||
DA devices installed and operational |
Quantity* |
Description |
Cost |
||
Automated feeder switches |
23 |
$17,131,864 |
|||
Automated capacitors |
33 |
$2,347,652 |
|||
Automated regulators |
|
||||
Feeder monitors |
0 |
$0 |
|||
Remote fault indicators |
0 |
||||
Transformer monitors (line) |
|
||||
Smart relays |
155 |
||||
Fault current limiter |
|
||||
Other devices |
|
$0 |
|||
SCADA and DA communications network |
Cost |
||||
Communications equipment and SCADA |
$16,827,252 |
||||
Distribution management systems integration |
Integrated |
Description |
|||
AMI |
|||||
Outage management system |
|||||
Distributed energy resource interface |
|
||||
Other |
|||||
Distribution automation features / functionality |
Function enabled |
Description |
|||
Fault location, isolation and service restoration (FLISR) |
Yes |
||||
Voltage optimization |
Yes |
||||
Feeder peak load management |
Yes |
||||
Microgrids |
|||||
Other functions |
|||||
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.