PECO
Recipient information |
Input |
||||
Total number of customers served by utility / utilities supporting the project |
|||||
Total number of residential customers served by utility / utilities supporting the project |
|||||
Total number of commercial customers served by utility / utilities supporting the project |
|||||
Total number of industrial customers served by utility / utilities supporting the project |
|||||
Total number of AMI smart meters installed and operational prior to the SGIG/SGD program |
|||||
AMI smart meters installed and operational |
Quantity* |
Cost |
|||
Total |
0 |
$0 |
|||
Residential |
0 |
||||
Commercial |
0 |
||||
Industrial |
0 |
||||
AMI smart meter features operational |
Feature enabled |
# of meters with feature |
|||
Interval reads |
No |
||||
Remote connection/disconnection |
No |
0 |
|||
Outage detection/reporting |
No |
0 |
|||
Tamper detection |
No |
0 |
|||
AMI communication networks and data systems |
Description |
Cost |
|||
Backhaul communications description |
Not deployed or operational |
$21,509,418 |
|||
Meter communications network |
Not deployed or operational |
||||
Head end server |
$31,667,638 |
||||
Meter data analysis system |
Not deployed or operational |
||||
Other IT systems and applications |
N/A |
||||
Web portal deployed and operational |
Quantity* |
Description |
|||
Customers with access to web portal |
0 |
||||
Customers enrolled in web portal |
0 |
Not deployed or operational |
|||
Customer systems installed and operational |
Quantity* |
Description |
Cost |
||
Communication networks and home area networks |
N/A |
N/A |
N/A |
||
In home displays |
0 |
Not deployed or operational |
$40,000 |
||
Energy management device |
5 |
N/A |
|||
Direct load control devices |
8 |
Additional load meters, devices that can be cycled or controlled by a utility or third party. |
$108,883 |
||
Programmable communicating thermostats |
0 |
Not deployed or operational |
$0 |
||
Smart appliances |
|||||
Customer system communication networks |
Description |
||||
Network characteristics within customer premise |
N/A |
||||
Distributed energy resources |
Quantity* |
Capacity |
Description |
Cost |
|
Distributed generation |
kW |
N/A |
|||
Energy storage |
0 |
0 kW |
$0 |
||
Plug in electric vehicle charging points |
kW |
$0 |
|||
Distributed energy resource interface |
N/A |
N/A |
|||
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.
Recipient information |
Input |
||||
Total number of customers served by utility / utilities supporting the project |
|||||
Total number of residential customers served by utility / utilities supporting the project |
|||||
Total number of commercial customers served by utility / utilities supporting the project |
|||||
Total number of industrial customers served by utility / utilities supporting the project |
|||||
Total number of distribution circuits within utility service territory |
|||||
Total number of distribution substations |
|||||
Portion of distribution system with SCADA prior to SGIG/SGD program |
|||||
Portion of distribution system with distribution automation (DA) prior to SGIG/SGD program |
|||||
Electric distribution system |
% |
Description |
|||
Portion of distribution system with SCADA due to SGIG/SGD program |
82.00% |
||||
Portion of distribution system with DA due to SGIG/SGD program |
32.00% |
||||
DA devices installed and operational |
Quantity* |
Description |
Cost |
||
Automated feeder switches |
99 |
Automated Feeder Switches (Reclosers), Automated Capacitors, Smart Relays and Controller Upgrades. |
$7,930,512 |
||
Automated capacitors |
62 |
$2,759,553 |
|||
Automated regulators |
|
||||
Feeder monitors |
|
||||
Remote fault indicators |
|
||||
Transformer monitors (line) |
|
$1,569,999 |
|||
Smart relays |
171 |
||||
Fault current limiter |
|
||||
Other devices |
254 |
$35,232,760 |
|||
SCADA and DA communications network |
Cost |
||||
Communications equipment and SCADA |
|||||
Distribution management systems integration |
Integrated |
Description |
|||
AMI |
No |
Not deployed or operational |
|||
Outage management system |
No |
Not deployed or operational |
|||
Distributed energy resource interface |
|
||||
Other |
No |
N/A |
|||
Distribution automation features / functionality |
Function enabled |
Description |
|||
Fault location, isolation and service restoration (FLISR) |
|||||
Voltage optimization |
No |
Not deployed or operational. |
|||
Feeder peak load management |
No |
Not deployed or operational. |
|||
Microgrids |
|||||
Other functions |
No |
N/A |
|||
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.