Midwest Independent Transmission System Operator
Recipient information |
Input |
||
Total miles of transmission line |
|||
Total number of transmission substations |
|||
Number of PMUs installed and operational before SGIG program |
10 |
||
Number of PDCs installed and operational before SGIG program |
|||
Electric transmission system |
Portion |
Description |
|
Portion of transmission system covered by phasor measurement systems |
13.33% |
||
Phasor measurement systems |
Quantity* |
Description |
Cost |
PMUs |
115 |
$7,654,278 |
|
Phasor data concentrators |
14 |
$1,671,754 |
|
Communications network |
$0 |
||
Other transmission assets |
Quantity* |
Description |
Cost |
Dynamic Capability Rating System (DCRS) |
|||
Other transmission assets |
0 |
N/A |
$0 |
Other transmission assets |
0 |
N/A |
$0 |
Other transmission assets |
0 |
N/A |
$0 |
Advanced transmission applications operational |
Operational |
Description |
Cost |
Angle/frequency monitoring |
|
||
Post-mortem analysis (including compliance monitoring) |
|
||
Voltage stability monitoring |
|
||
Thermal overload monitoring |
|||
Improved state estimation |
|
||
Steady-state model benchmarking |
|
||
DG/IPP applications |
|||
Power system restoration |
|
||
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.