Golden Spread Electric Cooperative
Recipient information |
Input |
||||
Total number of customers served by utility / utilities supporting the project |
|||||
Total number of residential customers served by utility / utilities supporting the project |
|||||
Total number of commercial customers served by utility / utilities supporting the project |
|||||
Total number of industrial customers served by utility / utilities supporting the project |
|||||
Total number of AMI smart meters installed and operational prior to the SGIG/SGD program |
|||||
AMI smart meters installed and operational |
Quantity* |
Cost |
|||
Total |
12,425 |
$2,440,564 |
|||
Residential |
10,861 |
||||
Commercial |
1,564 |
||||
Industrial |
0 |
||||
AMI smart meter features operational |
Feature enabled |
# of meters with feature |
|||
Interval reads |
Yes |
12,425 |
|||
Remote connection/disconnection |
Yes |
4,595 |
|||
Outage detection/reporting |
Yes |
12,425 |
|||
Tamper detection |
Yes |
12,425 |
|||
AMI communication networks and data systems |
Description |
Cost |
|||
Backhaul communications description |
$466,053 |
||||
Meter communications network |
Meters communicate via power line carrier using the back haul system |
||||
Head end server |
Commercial grade AMI software. |
$15,054 |
|||
Meter data analysis system |
This is performed by the MDMS software |
||||
Other IT systems and applications |
|||||
Web portal deployed and operational |
Quantity* |
Description |
|||
Customers with access to web portal |
9,872 |
||||
Customers enrolled in web portal |
9,872 |
||||
Customer systems installed and operational |
Quantity* |
Description |
Cost |
||
Communication networks and home area networks |
N/A |
NONE |
N/A |
||
In home displays |
0 |
NONE |
$0 |
||
Energy management device |
1,027 |
Included in the programmable thermostats. |
N/A |
||
Direct load control devices |
10 |
Software and hardware on water heater. |
$1,882 |
||
Programmable communicating thermostats |
1,027 |
Off the shelf thermostat available to the public. |
$471,701 |
||
Smart appliances |
|||||
Customer system communication networks |
Description |
||||
Network characteristics within customer premise |
NONE |
||||
| Pricing program | Customers with access |
Customers enrolled |
Description |
||
| Flat Rate | 9,872 | 1,823 | E-BILL RATE PROGRAM | ||
| Prepay | 9,872 | 98 | |||
Distributed energy resources |
Quantity* |
Capacity |
Description |
Cost |
|
Distributed generation |
0 |
0 kW |
$0 |
||
Energy storage |
kW |
||||
Plug in electric vehicle charging points |
kW |
||||
Distributed energy resource interface |
N/A |
N/A |
|||
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.
Recipient information |
Input |
||||
Total number of customers served by utility / utilities supporting the project |
|||||
Total number of residential customers served by utility / utilities supporting the project |
|||||
Total number of commercial customers served by utility / utilities supporting the project |
|||||
Total number of industrial customers served by utility / utilities supporting the project |
|||||
Total number of distribution circuits within utility service territory |
|||||
Total number of distribution substations |
|||||
Portion of distribution system with SCADA prior to SGIG/SGD program |
|||||
Portion of distribution system with distribution automation (DA) prior to SGIG/SGD program |
|||||
Electric distribution system |
% |
Description |
|||
Portion of distribution system with SCADA due to SGIG/SGD program |
100.00% |
100% utilized |
|||
Portion of distribution system with DA due to SGIG/SGD program |
100.00% |
43 Intelligent Electronic Devices
17 Remote Terminal Units
30 Switch Controls |
|||
DA devices installed and operational |
Quantity* |
Description |
Cost |
||
Automated feeder switches |
30 |
$189,761 |
|||
Automated capacitors |
8 |
$127,158 |
|||
Automated regulators |
16 |
$35,024 |
|||
Feeder monitors |
34 |
$118,952 |
|||
Remote fault indicators |
34 |
||||
Transformer monitors (line) |
0 |
$56,272 |
|||
Smart relays |
10 |
||||
Fault current limiter |
|
||||
Other devices |
|
||||
SCADA and DA communications network |
Cost |
||||
Communications equipment and SCADA |
$151,126 |
||||
Distribution management systems integration |
Integrated |
Description |
|||
AMI |
Yes |
A commercial SCADA system. 100% substations and metering points utilize SCADA |
|||
Outage management system |
Yes |
Commercial software system tied to MDMS,GIS and CIS |
|||
Distributed energy resource interface |
|
||||
Other |
|||||
Distribution automation features / functionality |
Function enabled |
Description |
|||
Fault location, isolation and service restoration (FLISR) |
No |
IED'S AND SCADA ARE USED FOR FLISR |
|||
Voltage optimization |
|
||||
Feeder peak load management |
No |
IMPLEMENTED WITH LOAD CONTROL SWITCHES |
|||
Microgrids |
|||||
Other functions |
|||||
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.