Florida Power & Light Company
Abstract
The Florida Power & Light (FPL) project is deploying advanced metering infrastructure (AMI), distribution automation, new electricity pricing programs, and advanced monitoring equipment for the transmission system. AMI supports two-way communication between FPL and its 3 million consumers receiving smart meters associated with the DOE grant, providing detailed information about electricity usage and the ability to implement new electricity pricing programs. New distribution automation devices expand the functionality of FPL’s distribution system to increase reliability, reduce energy losses, and reduce operations and maintenance costs. Synchrophasor and line monitoring devices help increase the reliability and security of the transmission system.
Bob Triana
ESF Operations Manager
Florida Power & Light Company
bob.a.triana@fpl.com
www.fpl.com/energysmart
- Advanced Metering Infrastructure (AMI) / Smart Meters
- Automated Capacitors
- Automated Distribution Circuit Switches
- Automated Voltage Regulators
- Distributed Energy Resource Interface
- Distribution Automation
- Equipment Condition Monitor
- Home Area Network
- In-Home Display
- Phasor Measurement Unit (PMU)
- Smart Meter - Industrial
- Transmission Line Monitoring System
- Reduce Electricity Costs for Customers
- Reduced Meter Reading Costs
- Reduced Operating and Maintenance Costs
- Improved Electric Service Reliability and Power Quality
- Reduced Costs from Equipment Failures and Theft
- Reduced Greenhouse Gas Emissions
- Reduced Truck Fleet Fuel Usage