EPB
Recipient information |
Input |
||||
Total number of customers served by utility / utilities supporting the project |
172,079 |
||||
Total number of residential customers served by utility / utilities supporting the project |
149,147 |
||||
Total number of commercial customers served by utility / utilities supporting the project |
19,460 |
||||
Total number of industrial customers served by utility / utilities supporting the project |
3,472 |
||||
Total number of AMI smart meters installed and operational prior to the SGIG/SGD program |
|||||
AMI smart meters installed and operational |
Quantity* |
Cost |
|||
Total |
172,612 |
$27,026,100 |
|||
Residential |
155,117 |
||||
Commercial |
17,495 |
||||
Industrial |
0 |
||||
AMI smart meter features operational |
Feature enabled |
# of meters with feature |
|||
Interval reads |
Yes |
172,612 |
|||
Remote connection/disconnection |
No |
0 |
|||
Outage detection/reporting |
Yes |
155,586 |
|||
Tamper detection |
No |
0 |
|||
AMI communication networks and data systems |
Description |
Cost |
|||
Backhaul communications description |
$63,848,000 |
||||
Meter communications network |
Meter communication between meters occurs through an unlicensed 900MHz radio spectrum system. |
||||
Head end server |
$7,682,000 |
||||
Meter data analysis system |
|||||
Other IT systems and applications |
|||||
Web portal deployed and operational |
Quantity* |
Description |
|||
Customers with access to web portal |
155,586 |
||||
Customers enrolled in web portal |
155,586 |
We have enabled our customer web portal to provide customers with access to their AMI interval data. |
|||
Customer systems installed and operational |
Quantity* |
Description |
Cost |
||
Communication networks and home area networks |
N/A |
N/A |
|||
In home displays |
0 |
$0 |
|||
Energy management device |
0 |
We have enabled our customer web portal to provide customers with access to their AMI interval data. |
N/A |
||
Direct load control devices |
0 |
$0 |
|||
Programmable communicating thermostats |
0 |
$0 |
|||
Smart appliances |
|||||
Customer system communication networks |
Description |
||||
Network characteristics within customer premise |
|||||
| Pricing program | Customers with access |
Customers enrolled |
Description |
||
| Time of Use Rate | 5,000 | 21 | |||
Distributed energy resources |
Quantity* |
Capacity |
Description |
Cost |
|
Distributed generation |
kW |
||||
Energy storage |
kW |
||||
Plug in electric vehicle charging points |
kW |
||||
Distributed energy resource interface |
N/A |
N/A |
|||
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.
Recipient information |
Input |
||||
Total number of customers served by utility / utilities supporting the project |
172,079 |
||||
Total number of residential customers served by utility / utilities supporting the project |
149,147 |
||||
Total number of commercial customers served by utility / utilities supporting the project |
19,460 |
||||
Total number of industrial customers served by utility / utilities supporting the project |
3,472 |
||||
Total number of distribution circuits within utility service territory |
309 |
||||
Total number of distribution substations |
117 |
||||
Portion of distribution system with SCADA prior to SGIG/SGD program |
|||||
Portion of distribution system with distribution automation (DA) prior to SGIG/SGD program |
|||||
Electric distribution system |
% |
Description |
|||
Portion of distribution system with SCADA due to SGIG/SGD program |
100.00% |
||||
Portion of distribution system with DA due to SGIG/SGD program |
100.00% |
||||
DA devices installed and operational |
Quantity* |
Description |
Cost |
||
Automated feeder switches |
1,294 |
$49,124,000 |
|||
Automated capacitors |
|||||
Automated regulators |
0 |
$0 |
|||
Feeder monitors |
|
||||
Remote fault indicators |
|
||||
Transformer monitors (line) |
|
||||
Smart relays |
0 |
||||
Fault current limiter |
|
||||
Other devices |
|
||||
SCADA and DA communications network |
Cost |
||||
Communications equipment and SCADA |
$1,488,000 |
||||
Distribution management systems integration |
Integrated |
Description |
|||
AMI |
No |
||||
Outage management system |
No |
The integration is currently underway and should be implemented in the 2nd quarter of 2013. |
|||
Distributed energy resource interface |
|
||||
Other |
|||||
Distribution automation features / functionality |
Function enabled |
Description |
|||
Fault location, isolation and service restoration (FLISR) |
Yes |
||||
Voltage optimization |
No |
EPB’s SCADA replacement project will include functionality to optimize voltage. |
|||
Feeder peak load management |
Yes |
||||
Microgrids |
|||||
Other functions |
|||||
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.