Detroit Edison Company
Recipient information |
Input |
||||
Total number of customers served by utility / utilities supporting the project |
2,131,067 |
||||
Total number of residential customers served by utility / utilities supporting the project |
1,932,344 |
||||
Total number of commercial customers served by utility / utilities supporting the project |
197,728 |
||||
Total number of industrial customers served by utility / utilities supporting the project |
995 |
||||
Total number of AMI smart meters installed and operational prior to the SGIG/SGD program |
|||||
AMI smart meters installed and operational |
Quantity* |
Cost |
|||
Total |
688,717 |
$92,054,271 |
|||
Residential |
636,571 |
||||
Commercial |
52,146 |
||||
Industrial |
0 |
||||
AMI smart meter features operational |
Feature enabled |
# of meters with feature |
|||
Interval reads |
Yes |
688,717 |
|||
Remote connection/disconnection |
Yes |
636,571 |
|||
Outage detection/reporting |
Yes |
688,717 |
|||
Tamper detection |
Yes |
688,717 |
|||
AMI communication networks and data systems |
Description |
Cost |
|||
Backhaul communications description |
|||||
Meter communications network |
|||||
Head end server |
$4,233,031 |
||||
Meter data analysis system |
|||||
Other IT systems and applications |
|||||
Web portal deployed and operational |
Quantity* |
Description |
|||
Customers with access to web portal |
315,137 |
||||
Customers enrolled in web portal |
2,528 |
||||
Customer systems installed and operational |
Quantity* |
Description |
Cost |
||
Communication networks and home area networks |
N/A |
N/A |
|||
In home displays |
871 |
$397,814 |
|||
Energy management device |
N/A |
||||
Direct load control devices |
|||||
Programmable communicating thermostats |
805 |
$557,098 |
|||
Smart appliances |
162 |
$423,093 |
|||
Customer system communication networks |
Description |
||||
Network characteristics within customer premise |
|||||
| Pricing program | Customers with access |
Customers enrolled |
Description |
||
| Time of Use Rate | 636,571 | 0 | |||
| Time of Use rate with Critical Peak Pricing | 636,571 | 1,489 | |||
| Prepay | 200 | 3 | |||
| Inverted Block | 636,571 | 605,307 | |||
Distributed energy resources |
Quantity* |
Capacity |
Description |
Cost |
|
Distributed generation |
kW |
||||
Energy storage |
kW |
||||
Plug in electric vehicle charging points |
kW |
||||
Distributed energy resource interface |
N/A |
N/A |
|||
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.
Recipient information |
Input |
||||
Total number of customers served by utility / utilities supporting the project |
2,131,067 |
||||
Total number of residential customers served by utility / utilities supporting the project |
1,932,344 |
||||
Total number of commercial customers served by utility / utilities supporting the project |
197,728 |
||||
Total number of industrial customers served by utility / utilities supporting the project |
995 |
||||
Total number of distribution circuits within utility service territory |
3,271 |
||||
Total number of distribution substations |
716 |
||||
Portion of distribution system with SCADA prior to SGIG/SGD program |
|||||
Portion of distribution system with distribution automation (DA) prior to SGIG/SGD program |
|||||
Electric distribution system |
% |
Description |
|||
Portion of distribution system with SCADA due to SGIG/SGD program |
1.54% |
||||
Portion of distribution system with DA due to SGIG/SGD program |
1.56% |
||||
DA devices installed and operational |
Quantity* |
Description |
Cost |
||
Automated feeder switches |
9 |
$8,696,694 |
|||
Automated capacitors |
40 |
$303,742 |
|||
Automated regulators |
16 |
$451,600 |
|||
Feeder monitors |
|
||||
Remote fault indicators |
|
||||
Transformer monitors (line) |
2 |
$3,613,354 |
|||
Smart relays |
75 |
||||
Fault current limiter |
|
||||
Other devices |
|
||||
SCADA and DA communications network |
Cost |
||||
Communications equipment and SCADA |
$461,392 |
||||
Distribution management systems integration |
Integrated |
Description |
|||
AMI |
Yes |
||||
Outage management system |
Yes |
This metric was not in Detroit Edison's approved MBRP; and therefore, it is out of scope. |
|||
Distributed energy resource interface |
No |
||||
Other |
|||||
Distribution automation features / functionality |
Function enabled |
Description |
|||
Fault location, isolation and service restoration (FLISR) |
Yes |
||||
Voltage optimization |
Yes |
||||
Feeder peak load management |
No |
This metric was not in Detroit Edison's approved MBRP; and therefore, it is out of scope. |
|||
Microgrids |
No |
This metric was not in Detroit Edison's approved MBRP; and therefore, it is out of scope. |
|||
Other functions |
|||||
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.