Consolidated Edison Company of New York, Inc.
Recipient information |
Input |
||||
Total number of customers served by utility / utilities supporting the project |
3,578,188 |
||||
Total number of residential customers served by utility / utilities supporting the project |
3,040,024 |
||||
Total number of commercial customers served by utility / utilities supporting the project |
532,825 |
||||
Total number of industrial customers served by utility / utilities supporting the project |
|||||
Total number of AMI smart meters installed and operational prior to the SGIG/SGD program |
|||||
AMI smart meters installed and operational |
Quantity* |
Cost |
|||
Total |
|||||
Residential |
|||||
Commercial |
|||||
Industrial |
|||||
AMI smart meter features operational |
Feature enabled |
# of meters with feature |
|||
Interval reads |
N/A |
||||
Remote connection/disconnection |
N/A |
||||
Outage detection/reporting |
N/A |
||||
Tamper detection |
N/A |
||||
AMI communication networks and data systems |
Description |
Cost |
|||
Backhaul communications description |
|||||
Meter communications network |
|||||
Head end server |
|||||
Meter data analysis system |
|||||
Other IT systems and applications |
|||||
Web portal deployed and operational |
Quantity* |
Description |
|||
Customers with access to web portal |
|||||
Customers enrolled in web portal |
|||||
Customer systems installed and operational |
Quantity* |
Description |
Cost |
||
Communication networks and home area networks |
N/A |
N/A |
|||
In home displays |
|
|
|||
Energy management device |
N/A |
||||
Direct load control devices |
|||||
Programmable communicating thermostats |
|
|
|||
Smart appliances |
|||||
Customer system communication networks |
Description |
||||
Network characteristics within customer premise |
|||||
Distributed energy resources |
Quantity* |
Capacity |
Description |
Cost |
|
Distributed generation |
0 |
0 kW |
Per the DOE-approved MBRP, "estimated installed capacity" is the only required metric listed above. |
$0 |
|
Energy storage |
kW |
||||
Plug in electric vehicle charging points |
kW |
||||
Distributed energy resource interface |
N/A |
N/A |
$0 |
||
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.
Recipient information |
Input |
||||
Total number of customers served by utility / utilities supporting the project |
3,578,188 |
||||
Total number of residential customers served by utility / utilities supporting the project |
3,040,024 |
||||
Total number of commercial customers served by utility / utilities supporting the project |
532,825 |
||||
Total number of industrial customers served by utility / utilities supporting the project |
|||||
Total number of distribution circuits within utility service territory |
2,513 |
||||
Total number of distribution substations |
130 |
||||
Portion of distribution system with SCADA prior to SGIG/SGD program |
|||||
Portion of distribution system with distribution automation (DA) prior to SGIG/SGD program |
|||||
Electric distribution system |
% |
Description |
|||
Portion of distribution system with SCADA due to SGIG/SGD program |
3.50% |
||||
Portion of distribution system with DA due to SGIG/SGD program |
3.50% |
||||
DA devices installed and operational |
Quantity* |
Description |
Cost |
||
Automated feeder switches |
327 |
$55,252,303 |
|||
Automated capacitors |
33 |
$7,945,582 |
|||
Automated regulators |
71 |
||||
Feeder monitors |
93 |
$27,194,741 |
|||
Remote fault indicators |
68 |
||||
Transformer monitors (line) |
6,249 |
$0 |
|||
Smart relays |
38 |
||||
Fault current limiter |
|
||||
Other devices |
23 |
$0 |
|||
SCADA and DA communications network |
Cost |
||||
Communications equipment and SCADA |
$8,597,244 |
||||
Distribution management systems integration |
Integrated |
Description |
|||
AMI |
|||||
Outage management system |
No |
||||
Distributed energy resource interface |
No |
||||
Other |
No |
||||
Distribution automation features / functionality |
Function enabled |
Description |
|||
Fault location, isolation and service restoration (FLISR) |
No |
||||
Voltage optimization |
No |
||||
Feeder peak load management |
No |
||||
Microgrids |
No |
||||
Other functions |
No |
||||
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.
