City of Fort Collins - City of Fountain
Recipient information |
Input |
||||
Total number of customers served by utility / utilities supporting the project |
|||||
Total number of residential customers served by utility / utilities supporting the project |
|||||
Total number of commercial customers served by utility / utilities supporting the project |
|||||
Total number of industrial customers served by utility / utilities supporting the project |
|||||
Total number of AMI smart meters installed and operational prior to the SGIG/SGD program |
|||||
AMI smart meters installed and operational |
Quantity* |
Cost |
|||
Total |
761 |
$134,168 |
|||
Residential |
727 |
||||
Commercial |
34 |
||||
Industrial |
0 |
||||
AMI smart meter features operational |
Feature enabled |
# of meters with feature |
|||
Interval reads |
Yes |
761 |
|||
Remote connection/disconnection |
Yes |
580 |
|||
Outage detection/reporting |
Yes |
761 |
|||
Tamper detection |
Yes |
761 |
|||
AMI communication networks and data systems |
Description |
Cost |
|||
Backhaul communications description |
Fiber, WiFi |
$222,834 |
|||
Meter communications network |
Spread spectrum frequency hopping mesh network |
||||
Head end server |
Yukon |
$0 |
|||
Meter data analysis system |
ElectSolve |
||||
Other IT systems and applications |
|||||
Web portal deployed and operational |
Quantity* |
Description |
|||
Customers with access to web portal |
0 |
||||
Customers enrolled in web portal |
0 |
ElectSolve |
|||
Customer systems installed and operational |
Quantity* |
Description |
Cost |
||
Communication networks and home area networks |
N/A |
N/A |
|||
In home displays |
0 |
Cooper Power Systems |
$0 |
||
Energy management device |
0 |
Still under contract negotiation |
N/A |
||
Direct load control devices |
0 |
Still under contract negotiation |
$0 |
||
Programmable communicating thermostats |
0 |
Still under contract negotiation |
$0 |
||
Smart appliances |
|||||
Customer system communication networks |
Description |
||||
Network characteristics within customer premise |
|||||
Distributed energy resources |
Quantity* |
Capacity |
Description |
Cost |
|
Distributed generation |
kW |
||||
Energy storage |
kW |
||||
Plug in electric vehicle charging points |
kW |
||||
Distributed energy resource interface |
N/A |
N/A |
|||
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.
Recipient information |
Input |
||||
Total number of customers served by utility / utilities supporting the project |
|||||
Total number of residential customers served by utility / utilities supporting the project |
|||||
Total number of commercial customers served by utility / utilities supporting the project |
|||||
Total number of industrial customers served by utility / utilities supporting the project |
|||||
Total number of distribution circuits within utility service territory |
|||||
Total number of distribution substations |
|||||
Portion of distribution system with SCADA prior to SGIG/SGD program |
|||||
Portion of distribution system with distribution automation (DA) prior to SGIG/SGD program |
|||||
Electric distribution system |
% |
Description |
|||
Portion of distribution system with SCADA due to SGIG/SGD program |
16.00% |
||||
Portion of distribution system with DA due to SGIG/SGD program |
0.00% |
||||
DA devices installed and operational |
Quantity* |
Description |
Cost |
||
Automated feeder switches |
0 |
Devices not selected yet |
$0 |
||
Automated capacitors |
0 |
||||
Automated regulators |
0 |
||||
Feeder monitors |
0 |
$0 |
|||
Remote fault indicators |
0 |
||||
Transformer monitors (line) |
|
$0 |
|||
Smart relays |
7 |
||||
Fault current limiter |
|
||||
Other devices |
|
||||
SCADA and DA communications network |
Cost |
||||
Communications equipment and SCADA |
|||||
Distribution management systems integration |
Integrated |
Description |
|||
AMI |
No |
Yukon |
|||
Outage management system |
No |
Yukon head end system |
|||
Distributed energy resource interface |
|
||||
Other |
|||||
Distribution automation features / functionality |
Function enabled |
Description |
|||
Fault location, isolation and service restoration (FLISR) |
|||||
Voltage optimization |
No |
Still under contract negotiation |
|||
Feeder peak load management |
No |
Still under contract negotiation |
|||
Microgrids |
|||||
Other functions |
|||||
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.