|
Task 2.5: Distributed Energy Resources Controller |
June 2009 |
Electric Power Research Institute |
|
Task 1.6 Scoping & Mapping of Smart Grid Projects |
June 2009 |
Electric Power Research Institute |
|
Taiwan Power Briefing on the Smart Grid |
March 2009 |
U.S. Department of Energy, National EnergyTechnology Laboratory |
|
System Operator Switches Feeders Based On Contingency Analysis |
December 2010 |
Electric Power Research Institute |
|
System Operator Identifies, Locates, Isolates And Restores Service After a Fault |
December 2010 |
Electric Power Research Institute |
|
System Engineer Retrofits A Substation |
December 2010 |
Electric Power Research Institute |
|
System Engineer Creates CIM Model From IEC 61850 Configuration |
December 2010 |
Electric Power Research Institute |
|
System Engineer Adds a Transmission Line with IEC 61850 Protection |
December 2010 |
Electric Power Research Institute |
|
Synergy between Electrified Vehicle and Community Energy Storage Batteries and Markets |
July 2011 |
Ohio State University, Center for Automotive Research |
|
Synchrophasor PMU Data Analysis for Enhanced Control Center Operations |
July 2011 |
ALSTOM Grid |
|
Synchronization in Power Networks and in Non-uniform Kuramoto Oscillators |
February 2010 |
U.S. Department of Energy, University of California at Santa Barbara |
|
Synchro Phasor |
December 2010 |
Electric Power Research Institute |
|
Sustainable Security for Infrastructure SCADA |
December 2003 |
U.S. Department of Energy, Sandia National Laboratories |
|
Supplemental Preliminary Business Case Filing |
January 2005 |
Pacific Gas & Electric |
|
supervisory control and data acquisition (SCADA) Data Update - KCPL |
December 2010 |
Electric Power Research Institute |
|
supervisory control and data acquisition (SCADA) Data Update |
December 2010 |
Electric Power Research Institute |
|
Summary Report on Experiential Workshops - Dynamic Pricing, Tariffs, and Price Responsive Demand Programs |
September 2002 |
California Public Utilities Commission |
|
Summary Report of Pre-Cooling and SCE Energy$mart Thermostat Focus Groups |
October 2004 |
U.S. Department of Energy, Ernest Orlando Lawrence Berkeley National Laboratory |
|
Summary of the June 2010 EEI Smart Grid Scenario Workshops |
June 2010 |
Edison Electric Institute |
|
Summary of Ratepayer-Funded Electric Efficiency Impacts, Budgets, and Expenditures |
January 2012 |
The Edison Foundation, Institute for Electric Efficiency |
|
Success Story: PSE&G Captures and Transfers the Knowledge of Power System Experts with EPRI Methodology |
May 2007 |
Electric Power Research Institute |
|
Success Story: Pickwick Electric Uses Distribution Fault Anticipator to Detect and Locate Fault to Improve Service Reliability |
August 2006 |
Electric Power Research Institute |
|
Success Story: EPRI Program 1 PQ Tools and Analysis Research (PQView) provides foundation for new fault location function at Consolidated Edison |
November 2005 |
Electric Power Research Institute |
|
Study of Security Attributes of Smart Grid Systems - Current Cyber Security Issues |
April 2009 |
U.S. Department of Energy, Idaho National Engineering and Environmental Laboratory |
|
Study Mode Topology Processor |
December 2010 |
Electric Power Research Institute |