|
D1: Distribution Operations Curtails Customer Load for Grid Management |
April 2006 |
Southern California Edison |
|
D2: Distribution Engineering or Operations Optimize Network based on Data Collected by the AMI System |
April 2006 |
Southern California Edison |
|
D3: Customer Installs and Uses Distributed Generation |
April 2006 |
Southern California Edison |
|
D4: Distribution Operator Locates Outage Using AMI Data and Restores Service |
April 2006 |
Southern California Edison |
|
S1: AMI System Recovers after Outage, Communications or Equipment Failure |
April 2006 |
Southern California Edison |
|
I1: Utility Installs, Provisions and Configures AMI System |
April 2006 |
Southern California Edison |
|
I2: Utility Manages End-to-End Life-Cycle of the Meter System |
April 2006 |
Southern California Edison |
|
I3: Utility Upgrades AMI System to Address Future Requirements |
April 2006 |
Southern California Edison |
|
Phase 1 Results: Incentives and Rate Design for Energy Efficiency and Demand Response |
April 2006 |
Demand Response Research Center, California Public Utilities Commission |
|
Responding to EPAct 2005: Looking at Smart Meters for Electricity, Time-Based Rate Structures, & Net Metering |
May 2006 |
Edison Electric Institute |
|
ANSI/CEA-709.2-A-2006 - Control Network Power Line (PL) Channel Specification |
May 2006 |
ANSI |
|
E1: Real Time Operations Curtails or Limits Load for Economic Dispatch (ES&M) |
May 2006 |
Southern California Edison |
|
E2: Utility Procures Energy and Settles Wholesale Transactions Using Data from the SmartConnect System |
May 2006 |
Southern California Edison |
|
Mitigations for Security Vulnerabilities Found in Control System Networks |
June 2006 |
U.S. Department of Energy, Idaho National Engineering and Environmental Laboratory |
|
Residential Demand Response Evaluation: A Scoping Study |
June 2006 |
U.S. Department of Energy, Ernest Orlando Lawrence Berkeley National Laboratory |
|
California's Statewide Pricing Pilot: Commercial & Industrial Analysis Update |
June 2006 |
Charles River Associates International |
|
AmerenUE Residential TOU Pilot Study: Load Research Analysis 2005 Program Results |
June 2006 |
RLW Analytics |
|
Action Items: Pricing to Induce Customer Demand Response |
June 2006 |
Mid-Atlantic Distributed Resources Initiative |
|
Demand Response Program Design Preferences of Large Customers: Focus Group Results from Four States |
June 2006 |
U.S. Department of Energy, Ernesto Orlando Lawrence Berkeley National Laboratory |
|
C1: Customer Reduces their Usage in Response to Pricing or Voluntary Load Reduction Events |
June 2006 |
Southern California Edison |
|
C2: Customer has Access to Recent Energy Usage and Cost at their Site |
June 2006 |
Southern California Edison |
|
C3: Customer Prepays for Electric Services |
June 2006 |
Southern California Edison |
|
C4: External Clients Use the AMI to Interact with Devices at Customer Site |
June 2006 |
Southern California Edison |
|
EPACT 1252 Webinar - DRAM Coalition |
July 2006 |
Demand Response and Advanced Metering |
|
Advanced Sodium-Sulfur (NaS) Battery Energy Storage System Project at MTA Long Island Bus |
July 2006 |
New York Power Authority |